PermitDig

Search Permits

180,604 results

Replacement of complete existing central heat and air system with or without duct work

1502 W 29TH ST, AUSTIN
Jun 19

Running waste and water lines from newer existing piping to new city taps recently installed on property line.

4513 AVENUE B, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

4608 CLAWSON RD, AUSTIN
Jun 19

EMERGENCY REPAIR TO RISER ONLY FROM STORM DAMAGE. AE PULLED METER REPAIR WAS COMPLETED AND INSPECTED BY COA INSPECTOR SEAN MCMULLIN AND AE RECONNECTED SERVICE

1625 BRUSHY VIEW CV, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

2401 BENDING TRL, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work replacement of hvac system

12502 MORELIA WAY, AUSTIN
Jun 19

Interior remodel including kitchen and bathroom updates Replacement of fixtures finishes flooring and cabinetry Interior reconfiguration in the living room area including modification of a load bearing wall. No change to building footprint or exterior walls.

1804 KENDRA CV, AUSTIN
Jun 19

irrigation for lawn

7401 PULLMAN CV, AUSTIN
Jun 19

Interior alteration of existing space (Suite 360 approx 6508) (Suite 365 approx 1083) and new D wall to create Suite 380 (approx 2179 sf) Floor 3

4516 SETON CENTER PKWY UNIT 360, AUSTIN
Jun 19

PUD New SFR 2- Story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio

8908 BREEZE HILL DR, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

3011 MICHOACAN DR, AUSTIN
Jun 19

Upgrading the main service panel to 200A

6100 CHERRYLAWN CIR, AUSTIN
Jun 19

Services upgrade from a 150AMPS to a 200AMP

14610 GOLD FISH POND AVE, AUSTIN
Jun 19

200amp OH services build

102 LAURA LN, ROLLINGWOOD
Jun 19

Replacement of complete existing central heat and air system with or without duct work

4304 TALLOWOOD DR, AUSTIN
Jun 19

New im-ground pool to rear of existing SFR

11408 PARKFIELD DR, AUSTIN
Jun 19

irrigation for lawn

13211 KEEFER DR, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

2524 MC GREGOR DR, AUSTIN
Jun 19

Pickle Elementary - Install two shade structures.

1101 WHEATLEY AVE, AUSTIN
Jun 19

This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 3 - Demolition and renovation of new parlor area.

400 LAVACA ST, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

3313 BRIDLE PATH, AUSTIN
Jun 19

Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications

1206 E 52ND ST BLDG B, AUSTIN
Jun 19

Interior Finish Out to create a Medical Office

4544 S LAMAR BLVD SB UNIT 695, AUSTIN
Jun 19

Gday we need to upgrade an existing duplex service as the incoming line is low and we need to group meters.

3303 TOM GREEN ST, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

5605 ALOMAR CV, AUSTIN
Jun 19

New Construction in the ETJ SFR

5813 TAUNTE DR, DEL VALLE
Jun 19

Replacement of complete existing central heat and air system with or without duct work Rick Conner

5248 MISSION CIR, AUSTIN
Jun 19

Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage closet

1000 WAGON TRL BLDG B, AUSTIN
Jun 19

New Construction in the ETJ SFR

5812 TAUNTE DR, DEL VALLE
Jun 19

Porch Enclosure- enclose existing porch on two sides with windows and door. Match existing siding on exterior. Install new flooring over wood deck. Insulate and sheetrock.

4006 HAMBLETONIAN, AUSTIN
Jun 19