PermitDig

Search Permits

180,604 results

NEW `D WALL TO CREATE SUTIE 155 WITH APPROX. (1043SF) OF EXISTING INTERIOR SPACE

4516 SETON CENTER PKWY UNIT 155, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

6005 ADAIR DR, AUSTIN
Jun 19

Interior alteration of existing space (Suite 360 approx 6508) (Suite 365 approx 1083) and new D wall to create Suite 380 (approx 2179 sf) Floor 3

4516 SETON CENTER PKWY UNIT 380, AUSTIN
Jun 19

New construction sfr in the etj 2278 sqft

5801 TAUNTE DR, DEL VALLE
Jun 19

ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [3bed 2bath] Work to include: Interior remodel First floor addition new office new rear patio.

903 CEDAR GLN, AUSTIN
Jun 19

*Retroactive* Addition of existing SFR

6109 LONDON DR, AUSTIN
Jun 19

Excavate 35 tunnel to repair main drain line under the house

7304 HOLLY FERN CV, AUSTIN
Jun 19

Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications

1206 E 52ND ST BLDG B, AUSTIN
Jun 19

Replacement of an existing water heater Replace 1 50-gallon Gas water heater Replace 1 50-gallon electric water heater Located in the garage

6304 BERKELEY CV, AUSTIN
Jun 19

irrigation for lawn

13215 KEEFER DR, AUSTIN
Jun 19

Replacement of furnace only

7502 EASTCREST DR, AUSTIN
Jun 19

New Construction in the ETJ SFR

5816 TAUNTE DR, DEL VALLE
Jun 19

Replacement of complete existing central heat and air system with or without duct work

12220 ANTOINETTE PL, AUSTIN
Jun 19

Express: Fire damage repair - Please reference AFD incident report - Please reference Engineers report for Required repairs.

4509 TURNSTONE DR, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

1506 W 13TH ST UNIT 14, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

11607 TALLOW FIELD WAY, AUSTIN
Jun 19

Interior remodel of two story residence with three bedrooms: Reconfigure bedrooms office laundry bathrooms kitchen and dining. Remove 1 bedroom on first floor and add bedroom on second floor. New windows.

5701 PAINTED VALLEY DR, AUSTIN
Jun 19

ePlan: Commercial Expedited Review - New Construction of 3 Shell Buildings with Mezzanine (13429 SF).

7000 JOHNNY MORRIS RD BLDG 1, AUSTIN
Jun 19

New pool and spa

5407 SHOAL CREEK BLVD, AUSTIN
Jun 19

ePlan: Commercial Expedited Review - New Construction of 3 Shell Buildings with Mezzanine (13429 SF).

7000 JOHNNY MORRIS RD BLDG 2, AUSTIN
Jun 19

Replacement of complete existing central heat and air system with or without duct work

8113 VIEW RIDGE DR, AUSTIN
Jun 19

Spot repair on existing sewer yard line. Less than 10 ft.

1209 TAYLOR ST, AUSTIN
Jun 19

SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 1-STORY 3 BEDROOM WITH 2 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO

4707 NATIVE PEARL LN, AUSTIN
Jun 19

New 2-Story Single Family Residence 3 or 4 bedrooms 3.5 bathrooms and a 3 Car Garage Covered Entry Porch & Patio.

11317 ZIP COCHISE WAY, MANOR
Jun 19

EXPRESS: Replacing 1 window and 1 door like for like

5324 HUTCHINSON DR, AUSTIN
Jun 19

Replacement of furnace only

11200 SILO VALLEY DR, AUSTIN
Jun 19

Express: Tub to shower (prefab base) in the same location

2212 BLALOCK DR, AUSTIN
Jun 19

Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications

1206 E 52ND ST BLDG B, AUSTIN
Jun 19

This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor.

400 LAVACA ST, AUSTIN
Jun 19

Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage

7806 NAIRN DR, AUSTIN
Jun 19