247,532 results
TEMPORARY ELECTRICAL PERMIT - Scope is limited to install new sports light pole foundations and poles.
Replacement of complete existing central heat and air system with or without duct work
Austin Full Purpose Install 100 amp. Overhead temporary power pole at 7303 Carver Avenue Ref: 2026-085077 BP
Repairing wires to main electrical service. The cable was stolen and a new cable will be installed.
Express: Foundation repair (20 exterior pilings)
Replacement of complete existing central heat and air system with or without duct work
Addition Primary suite and laundry addition raising the roof line on the entire house to increase the pitch and extending the front covered patio.
Renovations to create moisture barrier for future tenant - Not for Occupancy
Run new gas line drop off left side of building roof for new Texas Gas Meter Set. Connected into existing rooftop gas line with tee and isolation valves.
Total Demo of SFR 1528 sqft circa 1956
New construction in-ground pool and spa.
Express- Replace exterior windows and vinyl siding on exterior of property
Bldg 2A New construction of a 3-Story SF Res [3bed 3.5bath] with attached Carport
CHANGE OF USE to Retail Sports: Interior remodel of an existing space including new lighting for a retail sports and collector cards occupancy. 2026 097978 DA - Approved
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport. Bldg 1
ePlan: Residential Expedited Review - New construction of a 3-Story Duplex [3bed 3.5bath] with Attached Carport and Autofill Pool. UNIT 1A
Tub to Shower Replacement (prefab base) in the same location.
BASE: Installing a backup battery system and additional meter socket.
Interior Remodel of 1-story residence conversion of front office to open living space. Repair fire damaged components.
DEMO MASTER BATHROOM. IT WILL BE A TUB-TO-SHOWER CONVERSION. DEMO BATHTUB AND FRAME FOR NEW SHOWER PAN SIZE WILL BE 66X40; VANITY WILL BE DEMOLISHED AND REPLACED WITH A NEW 72-INCH VANITY. WE WILL BE DOING TWO NEW LIGHTS ABOVE THE MIRROR; REPLACE OLD WITH NEW. WE WILL BE INSTALLING A POCKET DOOR TO REPLACE THE CLOSET DOOR. WE WILL INSTALL 100 SQFT OF TILE AND 18 SQFT OF SHOWER PAN FOLLOWED BY 80SQFT OF FLOOR TILE.
Interior Remodel - Office Area Open Office Areas and Breakout Area.
Unit 103 New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport
irrigation for lawn
Unit 103 New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Garage
100/125 amp panel grounding and bonding
CHANGE OF USE RETAIL TO RESTAURANT will be a small primarily grab and go QSR see operations document attached for more detailed information
Replacement of complete existing central heat and air system with or without duct work
Total demo of single-story SFR 654 sq ft circa 1974 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Install one new 25A 2-pole 240V circuit from the existing 200A main panel to a new outdoor disconnect for a mini-split. Install tandem breakers in the existing panel to make space. No service change.
Austin Full Purpose T-pole Ref: 2026-009646 BP