INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.

35-16 126 STREET, Queens
10KJul 9

Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

4 EAST 67 STREET, Manhattan
0KJul 9

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

29 MT HOPE PLACE, Bronx
4KJul 9

INTERIOR RENOVATION, INSTALL A.C. SYSTEM AT BEAUTY SALON OF EXISIGN 1-STORY BUILDING WITH GENERAL CONSTRUCTION WORK AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR C OF O.

378 6 AVENUE, Manhattan
100KJul 9

INSTALLATION & USE OF HOIST AS PER DRAWINGS ATTACHED HEREWITH

22 WEST 19 STREET, Manhattan
2KJul 9

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

260 PARK AVENUE SOUTH, Manhattan
0KJul 9

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

411 8 AVENUE, Manhattan
7KJul 9

Direct replacement of a rooftop 5-ton compressor condenser unit on existing steel dunnage

1779 RICHMOND AVENUE, Staten Island
13KJul 9

INSTALLATION OF PIPE SCAFFOLDING AND NEEDLE BEAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

3752 BAYVIEW AVENUE, Brooklyn
10KJul 9

INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33

1581 MYRTLE AVENUE, Brooklyn
5KJul 9

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1115 BOSTON ROAD, Bronx
1KJul 9

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

315 EAST 68 STREET, Manhattan
1KJul 9

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

467 10 AVENUE, Manhattan
0KJul 9

INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY

23 MT HOPE PLACE, Bronx
0KJul 9

INSTALLATION OF TEMPORARY PIPE SCAFFOLD & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

23 MT HOPE PLACE, Bronx
0KJul 9

Installation of swingstage scaffolding as per plan and in accordance with Chapter 33 of NYC 2022 Building Code. No change in use, egress or occupancy.

6 WEST 77 STREET, Manhattan
Jul 9

sadas

10 ABINGDON AVENUE, Staten Island
Jul 9

Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

4 EAST 67 STREET, Manhattan
5KJul 9

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

179 AMBOY STREET, Brooklyn
1KJul 9

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

306 WEST 94 STREET, Manhattan
7KJul 9

Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use, occupancy, or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with Chapter # 33 of the 2022

41 BEEKMAN STREET, Manhattan
7KJul 9

INSTALLATION OF TEMPORARY PIPE SCAFFOLD & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

29 MT HOPE PLACE, Bronx
0KJul 9

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

25 8 AVENUE, Brooklyn
1KJul 9

ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

1869 EAST 19 STREET, Brooklyn
74KJul 9

SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE INSPECTION AT 360 East 137th Street, Bronx, NY 10454

360 EAST 137 STREET, Bronx
Jul 9

USE OF MECHANICAL DEMOLITION EQUIPMENT DURING PARTIAL DEMOLITION, FILED SEPARATELY UNDER M01394813-I1

750 3 AVENUE, Manhattan
15KJul 9

Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

25-08 43 AVENUE, Queens
5KJul 9

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

127 EAST 30 STREET, Manhattan
1KJul 9

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

83 MADISON STREET, Manhattan
1KJul 9

INSTALLATION OF TEMPORARY CHUTE AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.

3200 SKILLMAN AVENUE, Queens
1KJul 9