Search Permits
251,795 results
INSTALLATION OF TEMPORARY ROOF WATER TOWER ROOF/ OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR (NORTH) AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE RESTORATION WORK AT 1650 BROADWAY, MANHATTAN, NY 10019
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Direct replacement of a rooftop 6.5-ton and 10-ton HVAC package unit on existing roof curbs. Installation of a new 2.5 ton mini split unit on existing steel dunnage.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Installation of construction fence in conjunction with X00780718
Sprinkler modifications taking place on the cellar and 1st floor as per plans filed herewith. No change in use, egress or occupancy
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEM. PIPE SCAFFOLD FOR NEW BUILDING CONSTRUCTION AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.SIDEWALK SHED FILED ON A SEPARATE APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION WOOD FENCE.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF AN AWNING WITH BUSINESS NAME (HELLO BEAUTY) & BUILDING NUMBER ON STOREFRONT AT FIRST FLOOR LEVEL OF EXISTING BEAUTY SUPPLY STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO DISTURBING EXTERIOR WALL.
PROPOSED TEMPORARY CONSTRUCTION FENCE LOCATED INSIDE OF THE PROPERTY LINE FOR THE CONSTRUCTION OF A NEW DETACHED TWO FAIMLY RESIDENCE.
INSTALL NON-ILLUMINATED WAL SIGN (TERRA)
MINOR PARTITION WORK OF EXISTING BEAUTY SALON. NO CHANGE IN USE OCCUPANCY OR EGRESS.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - HOUSE OF LUXE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Temporary installations to be used for temporary event YouTube Creator Cup. All installations are to be removed upon completion of the event.
PROPOSED INTERIOR RENOVATION ON CEL. ATTIC & 1ST THRU. 2ND FLOOR. GENERAL CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNINGS - CRANE CLUB. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
NEW TENANT FIT-OUT AT EXISTING RESTAURANT ON THE 1ST FLOOR. WORK INCLUDES REMOVAL/INSTALLATION OF NON-BEARING PARTITIONS, RELOCATE BATHROOM & KITCHEN AREA, AND NEW HVAC & KITCHEN HOOD AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANY.
NEW CERTIFICATE OF OCCUPANCY, INTERIOR RENOVATION @ FIRST FLOOR AND CELLAR WITH PARTITION AND PLUMBING WORK, MODIFICATION/INSTALLATION OF FIRE ALARM SYSTEM
Sprinkler changes on the 40th floor (temp loop installation) as indicated on drawings.
FANATICS FEST NYC 2026: Kamp Grizzly- ACTIVISION BOOTH #1905 to install a temporary exhibit within an existing exhibition building. Scheduled construction on 07/10 - 07/20, 2026. No change in use, egress, or occupancy.