Search Permits
251,795 results
anchorage of retail shelving units
ab-004: priority: cold formed metal framing (ext) for issued full permits: 20241121542 & 202411215486
structural revision to pa#2022-0420-2645 s1: a replacement of the (e) site condition at the rear garage to include a structural foundation
add new exterior stairs to the existing deck going down to the rear garden and add new fire rated wall next to it at the property line. add new fire rated windows at the property line wall.
hall bathroom, replace tub with tub, wall tiles, new plumbing and shower door. master bathroom replace 2 windows non street facing, shower pan, shower door, tiles, new vanity, new toilet, new lights.windows are same size and at the same location.
repair of rear deck. no more than 50% like for like materials; wood for wood.
permit revision to pa# 202605141302 to add minor modifications to 3 (e) huddle rooms and 3 (e) phone rooms to scope
to obtain final inspection for work approved under pa#: 202407055861. all work is complete.
following leak renovation in kind of 2 floors drywall, insulation, flooring, cabinetry
tenant improvement to existing building. ground lfoor is being brought up to code for egress, restrooms, and sprinklers. no work on 2nd floor. no change to facade.
building
mechanical
electrical
mechanical
electrical
plumbing
mechanical
mechanical
electrical
building
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHAGNES TO THE EGRESS, USE OR OCCUPANCY.
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR (SOUTH) AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
test
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Installation of a heavy duty sidewalk shed
Propose plumbing work at residential units as per plan. No change in use, egress, or occupancy.