Search Permits
179,161 results
ePlan: Commercial Expedited Review - New Construction of 51 EV Chargers.
San Luis 1512-J-R New 2-Story Single Family Residence with (4) bedrooms (3) bathrooms Attached Garage Covered Patio & Porch Cafe & Game Room
Total demo of SFR 768 sq ft circa 1951 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
ePlan: Residential Expedited Review - New Autofill/Heated pool w/Spa.
ePlan: Residential Expedited Review - New Autofill/Heated Pool.
EXPRESS: Foundation repair - installing steel piers
Peform and Air test on an existing gas line.
Install Level 2 EV Charger
Replacement of an existing water heater swapping out electric tank water heater for similar model.
QT - small interior remodel - selective demolition construction of new partitions ceilings mechanical electrical and plumbing as indicated on drawings at existing office space - OVA
Install Level 2 EV Charger
Main and sub panel changeout
Gas line from meter to 22KW standby generator under 10ft
Installation of 60amp EV Charger
Express: Foundation repair (install 32 sonotubes and 15 ft beam to left and stabilize the foundation)
ePlan: Residential Expedited Review - New Construction of a 2-Story SF Res [4bed 6bath] with attached garage
New portable and flatwork. 2026 067974 DA - Approved.
Construct new driveway approach of 17 FT and sidewalk of 23 LF
ePlan: Commercial Expedited Review - New Construction of Generator 1.
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [2bed 1bath] Work to include: First floor Interior remodel First Floor Addition new beds new baths [4bed 3bath].
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office Space (22320 SF)
installation of dedicated circuit for fridge in garage and ev charger install.
Interior Remodel - Bathroom Remodel Kitchen Remodel Laundry Room Remodel replace existing windows with new windows same size and location replace existing skylight
Construct new driveway approach of 17 FT and sidewalk of 21.25 LF
NEW 2 STORY SINGLE-FAMILY RESIDENCE ATTACHED GARAGE COVERED PORCH AND PATIO 4/3
Retroactively permit a kitchen remodel. Replace an existing beam with a suitable one per the Structural Engineers requirements.
Demolition of a warehouse structure approximately 11760 sq ft circa 2014. SP-2025-0304D - Approved
Replacement of complete existing central heat and air system with or without duct work
Emergency Gas permit BLDG 2
Drywall kitchen bathrooms flooring & painting due to Fire/Water Damage for 5 Units Unit 301