Search Permits
179,161 results
Replacement of an existing water heater 50gal electric tank located in a closet
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Habitable Attic and Attached Garage.
Salon Centric
Repair of water damage following a fire extinguished on the upper floor of an existing multi-family apartment building. This project scope includes replacement of damaged elements: the buildings use occupancy area height and number of dwelling units will not be modified.
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office/Warehouse (54864 SF).
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [2bed 2bath] Work to include: First floor addition and interior remodel adding 1bath
Emergency Repair of damaged disconnect ONLY per Hyatt Dunn
Interior Alteration of Approx. (3895) of existing Suite 425.
New single family residence - 2 story 4 bed/ 2.5 bath 2003 sqft living with attached garage.
Harrison S356 D Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
TPOLE REF BP # 2026-036951
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [6bed 6bath] Work to include Interior remodel and addition to existing covered porch. Bldg 1
Demise new small tenant space 101B within existing vacant tenant space 101. 101B to serve the business use in suite 108. Finish out of 101 to be submitted under sperate application. No access control. No plumbing scope. (Suite 101B)
15 Interior trench thru slab for bathroom addition at front left of home for shower toilet and lavatory drain addition
Removal and disposal of existing pipe Installation of properly sloped and sized PVC drain lines Per contractor The drain pipes are under the foundation and through the yard. There will be no drywall cut on the inside of the home either. (6/10/26)
Interior remodel of two story residence with three bedrooms: Reconfigure bedrooms office laundry bathrooms kitchen and dining. Remove 1 bedroom on first floor and add bedroom on second floor. New windows.
interior remodel and major addition to existing two-story single-family residence. Scope includes first-floor addition partial second-floor addition reconfigured kitchen/living areas window and door modifications roof framing work and related electrical plumbing and mechanical updates
ePlan: Commercial Expedited Review - New Construction of Generator 3.
Installing a gas line to a permanent generator
Express: Remove and replace 16 windows (like for like)
Drywall kitchen bathrooms flooring & painting due to Fire/Water Damage for 5 Units Unit 201
Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2
Replacement of an existing water heater Remove and replace Water Heater - 40 gal Gas
Tunnel 20 feet under the house from lift station. Fix break and bellies in line. Install 35 feet of new sewer yard line with schedule 40 PVC
EXPRESS: Foundation repair on a slab foundation. Install 16 total press piling pier locations along the perimeter.
ePlan: Residential Expedited Review - New Autofill/Heated Pool
Residential Add on of Battery to the Residents Existing Roof Mounted Solar System
Interior remodel siding and window replacement interior finishes replaced den will be made into a bedroom half bath added kitchen remodeled primary bed and bath modified relocating walls and plumbing fixtures HVAC system replaced
Updated kitchen cabinets only same location replaced inside and outside electrical panels. Updated tankless hot water heater and change AC.
Excavate 52 trench to repair main drain line in the yard