Search Permits
167,869 results
New 2309 SF single story residence with a 2+ car garage at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs - SEE ADDENDA MST25-07605 - See permit MST26-08011 for addenda - Code update 2024.
Group B occupancy. Type V-B construction. 4,949 SF. Occupant load 53. New partition walls to create exam rooms, ADA compliant restrooms, storage, equipment room, x-ray room, lounge, front office, waiting area, and sterilization room. New architectural and MEPs. New mechanical supply air and return air ducting to (3) existing heat pump RTUs. New plumbing fixtures, waste lines, and water lines. New vacuum pump system. Existing electrical meter and SES. No medical gas under this permit. Deferred fi
A new 785 SF attached metal pergola per engineering plans.
TI for electrical in an existing III-B F-1/S-1/B suite. Electrical for (2) new assembly lines only. Reviewed as noted. Results in CoC.
Brighton Homes Plan #1 - Master plan for new 1792 S.F livable, 659 S.F. non-livable. Two story with a 2 car garage. - Type V-B construction. R-5 occupancy. New ¾” water meter. New electric meter. Special inspections required for steel construction - reinforcing steel incl pt tendons and anchors, concrete construction, post-installed anchors, and soils - pad cert. Deferred Truss Calcs and engineered joist. EV-Charger
Remodel park model including new 36 SF wood deck, exterior stucco, windows and door replacement, and raise deck floor height. Additionally, construct 92 SF shed with electric and plumbing for washer, dryer and bathroom. Ref: COB26-00136.
STIP: THIS LOT IS BEING USED AS REQUIRED PARKING FOR THE MODEL HOME COMPLEX/SALES OFFICE (PMT23-04511). DO NOT ISSUE ANY CONSTRUCTION PERMITS FOR THIS LOT UNTIL THE FOLLOWING HAVE BEEN CONVERTED BACK AND THE PARKING LOTS ARE NO LONGER NEEDED: SALES OFFICE/MODEL HOME: LOT 87 (3833 S DAISY, PMT23-04511), ADDITIONAL PARKING LOT: LOT 89 (3843 S DAISY, PMT23-07456). ****HAWES CROSSING VILLAGE 2 PARCEL A****
STIP: THIS LOT IS BEING USED AS REQUIRED PARKING FOR THE MODEL HOME COMPLEX/SALES OFFICE (PMT23-04511). DO NOT ISSUE ANY CONSTRUCTION PERMITS FOR THIS LOT UNTIL THE FOLLOWING HAVE BEEN CONVERTED BACK AND THE PARKING LOTS ARE NO LONGER NEEDED: SALES OFFICE/MODEL HOME: LOT 87 (3833 S DAISY, PMT23-04511), ADDITIONAL PARKING LOT: LOT 88 (3837 S DAISY, PMT23-07447). ****HAWES CROSSING VILLAGE 2 PARCEL A****
Installation of canopies for approximately 218,000 sqft
New 2,667 SF two-story residence with a 2 car garage in AVALON CROSSING. Includes electric, gas and water meter. Elevation E has second story balcony. Special inspection for post tension-slabs. See permit MST26-06694 for addenda - Code Update 2024.
The inspection of the site identified the following: Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structur
Tenant improvement of 1,650 SF of B occupancy office/work areas in existing 555,245 SF type VB construction, B and S-1 occupancy warehouse. Modification include install of interior partitions to create (3) office /work areas with new ceilings and associated MEP: (2) new heating coils, sanitary pump install, power and lighting. Deferred fire sprinklers and fire alarms, and access control. Approved with comments. Results in CoC.
Brighton Companies Plan 2 Master plan for new 2094 S.F livable, 677 S.F. non-livable. 2 story, Single-family home construction. New water and electric meters. Type V construction. R-5 occupancy. New 3/4-inch water meter, 200 amp electrical. Special inspections required for Steel construction - reinforcing steel incl pt tendons and anchors, Concrete construction 1705.3 / table 1705.3, Soils - pad cert. and Post-installed anchors. Truss Calcs deferred.
Build room addition with elect and plumb on raised deck.
Brighton Homes Plan #1 - Master plan for new 1792 S.F livable, 659 S.F. non-livable. Two story with a 2 car garage. - Type V-B construction. R-5 occupancy. New ¾” water meter. New electric meter. Special inspections required for steel construction - reinforcing steel incl pt tendons and anchors, concrete construction, post-installed anchors, and soils - pad cert. Deferred Truss Calcs and engineered joist. EV-Charger
Brighton Homes Plan #1 - Master plan for new 1792 S.F livable, 659 S.F. non-livable. Two story with a 2 car garage. - Type V-B construction. R-5 occupancy. New ¾” water meter. New electric meter. Special inspections required for steel construction - reinforcing steel incl pt tendons and anchors, concrete construction, post-installed anchors, and soils - pad cert. Deferred Truss Calcs and engineered joist. EV-Charger
Install (1) exterior wall mounted non-illuminated sign Non Illuminated acrylic letters PILATES, 16.6 sq ft.
Install (2) exterior wall mounted illuminated signs with pan channel lettering. BRAIN BALANCE w/logo 28 Sq ft each.
Brighton Companies Plan 2 Master plan for new 2094 S.F livable, 677 S.F. non-livable. 2 story, Single-family home construction. New water and electric meters. Type V construction. R-5 occupancy. New 3/4-inch water meter, 200 amp electrical. Special inspections required for Steel construction - reinforcing steel incl pt tendons and anchors, Concrete construction 1705.3 / table 1705.3, Soils - pad cert. and Post-installed anchors. Truss Calcs deferred.
Brighton Homes Plan #1 - Master plan for new 1792 S.F livable, 659 S.F. non-livable. Two story with a 2 car garage. - Type V-B construction. R-5 occupancy. New ¾” water meter. New electric meter. Special inspections required for steel construction - reinforcing steel incl pt tendons and anchors, concrete construction, post-installed anchors, and soils - pad cert. Deferred Truss Calcs and engineered joist. EV-Charger
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
INSTALLING (1) ILLUMINATED WALL SIGN
Converting tub to shower, replacing pan, drain, and valves. No structural changes.
We want to extend the west end of the house approximately 8 ft to increase the size of both bedrooms and reconfigure the bathroom. The goal is to create a private suit with its own full bathroom and add a powder room for the main house. the additional space is 306sqft
Stem Wall Repair at existing SFR. Special inspections required.
INSTALLING A PUMP SKIP AND STEEL SELF-VENTING 275 GALLON CAPACITY INTERMEDIATE BULK CONTAINER (IBC) FILLED WITH WINDOW WASHER LIQUID. WASHER LIQUID WILL BE PIPED THROUGH EXISTING CODE COMPLIANT PIPING SYSTEM TO A PUMP DISPENSER AT VEHICLE ASSEMBLY LINE. THERE IS NO CHANGE TO OVERALL OCCUPANCY COUNT, OCCUPANCY DESIGNATION AND EXISTING ESFR FIRE SPRINKLER SYSTEM. SCOPE OF WORK ALSO INCLUDES INSTALLING AIR COMPRESSORS.
Previously Remodeled work
convert existing 3 car garage into livable space.
Installation of 120-gallon propane tank to manufactured home with ¾-in PE gas line buried 20-in with 18-gauge tracer wire from tank to MH inlet. Gas line to be installed per 2024 IFGC, 2024 NFPA 58 & FPD 6104.1.
New patio for Barrio Brewery at the Mesa Gateway Airport. this project will be for new paving, steel structure and overhead shade structure. Deferred fire sprinklers.