Search Permits
191,479 results
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [3bed 3bath] Work to include: First floor Interior remodel First Floor Addition New bed New half bath [4bed 3.5bath].
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Interior alteration of an existing office space- 7 day review (3 applications- Suites 110 125 and 130)
Construct new sidewalk of 600 LF. Work Approved on: SP-2023-0464D SSI#2026 103801 000 00 SSI DAPCZ project name STX-TFC Capitol Complex Phase 2-Site Utilities
*SMART Housing* *Green Building* New construction single-family attached residential rowhouse 2-story 3 bedroom 2.5 bath with covered front porch.
tunnel and replace all the waste line under slab
New two-story SFR 3 bed 2.5 bath with attached garage covered front porch and rear covered patio
Construct new sidewalk of 300 LF. Work Approved on: SP-2023-0464D SSI#2026 103801 000 00 SSI DAPCZ project name STX-TFC Capitol Complex Phase 2-Site Utilities
Construction of a new 51250 sq. ft single story middle school. 210-850-8661
Total demo of SFR 2185 sq ft circa 1941 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
(Fong Alan) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
CHANGE OF USE TO FOOD SALES/cafe selling cakes and serving cake slices and pastries. No food preparation. All food prepared offsite
Replace cast-iron underneath the foundation. Two bathrooms one kitchen one washer drain. 45 feet of excavation. Approximately 45 feet of cast-iron plumbing repair being replaced. Two access points one by the front door one by the rear door.
Express: bathroom/kitchen remodel door replacement flooring/painting
CHANGE OF USE from Personal Services (Dry Cleaners) to Restaurant 2025 075146 DA - Concurrent Reviews
New Construction of Apartment Complex in the ETJ (sq ft - 25842) 24 Units - 3 Floors
Construct new sidewalk of 220 LF. Work Approved on: SP-2023-0464D SSI#2026 103801 000 00 SSI DAPCZ project name STX-TFC Capitol Complex Phase 2-Site Utilities
ev install
Express: Replace 10 existing windows- size for size 1 existing entry door size for size
Non-Structural Interior Demolition
ePlan: Commercial Expedited Review - Remodel to Existing PARD Recreation - including roof replacement abatement restoration of windows door chimneys electrical/plumbing upgrades new HVAC system and reconfiguration of restroom and support spaces (3169 SF)
Upgrading existing service to a 200a service.
*PRODUCTION BUILDER/CONDO* New Construction- 2 story SFR in condo regime. 3 bed 2.5 bath
Interior Remodel Unit B Kitchen bathroom and bedroom remodel
2026/09/04 - 2026/09/06 | The Lone Star Le Mans (LSLM) is a thrilling 6-hour endurance racing event held at the Circuit of the Americas (COTA) in Austin Texas.
New inground swimming pool and spa w/ reqd enclosure device.
We will be installing a temporary rack for construction
Express: tub to tub and a tub to shower conversion
Replacing flooring replacing kitchen island and cabinet in kitchen. Creating new laundry room and enclosing front porch. Front porch will remain non air conditioned. Non-compliant storage building to be removed.
Replacement of complete existing central heat and air system with or without duct work hvac change out