revision to pa# 202107265070. enlarge rear deck for upper unit. new french doors from bedroom to deck.
recommencement and completion of work approved under pa# 2019-0322-5984, # 2019-0517-1045 and # 2019-0812-8579
to obtain final inspection for work approved under pa# 202111041834. all work is complete.
detatched garage back of property: to comply with nov 202654867, in kind garage door replacement, like for like, no electrical, no structual change.
revision to app #202607144970 to add 4 smart jacks with 4 cast in place footings and #16ft of supplimental beams. all other scopes of work will remain the same.
1 primary bathroom and 1 power room remodel in kind. all like for like. 1 kitchen remodel like for like. all work interior. poweder room and kitchen 1st flr and primary bathroom 2nd flr.
solar permit: installing 8 solar pv modules, 432 watts per module, total no. of rating 3.456 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | install rooftop pv and b
to obtain final inspection for work approved under pa 202501178612. no work to be completed.
replace damaged gate in kind. north of lot. approx. 18 linear feet wide and 8' tall.
14th floor: electrical for pa #202605201633 project.
to obtain final inspection for work approved under pa# 201911197663, 202403228445, 202012151023. all work is complete.
add conditioned space to 1/f with new bedroom and 1.5 baths. remodel existing 2/f kitchen and bath. new deck < 10' h within buildable area.
revision to pa#202506098260. relocate steel colmun along grid line b. 4' away to original position due to obstuction of electrical panels.
kitchen remodel in-kind with (e) kitchen.
replace handrail, waterproofing and tile like to like in the back of the house. replace bottom panels at handrail plywood for laminated glass.
replace only the bath tub in the guest bathroom (bathtub to bathtub), replace (e) fan upgrade m-e-p as needed to code.
to obtain final inspection for work approved under pa #202504094023. all work is complete.
first floor: bathroom remodel like for like, no conversions, no walls being moved. all like for like.
parking garage: to comply with nov 20260241: perform patchwork to drywall to enable plumbing repairs in parking lot. approx 128 sq ft. 5/8'' type x gypsum board everywhere. street facing repairs.
earth shoring plan as per requirement stated on pa# 202409060254.
revision to 202507301916: (t-mobile) revision to steel beam connection @ rooftop, steel beam end is short, need to add to beam to reach connection point
rev 202603127448: structural revision to add 2x10 df at 16in o.c. per plan.
29th floor: selective demo of non load baearing partitions, removal of power+ data outlets,lighting, switches, associated devices. removal of suspended ceiling tiles, grid +related ceiling mounted devices. removal of (e) floor covering down to the substrate. all work is interior, non structural.
to obtain final inspection for work approved under pa# 202309136521. all work is complete.
revision to bpa: 202506068098 - for freight removal, removal of (e) sprinklers in the following elevators passenger p1&p2, hostway (north penthouse 2nd level) and elevator machine room (north penthouse and tank) freight elevator f1- 1 sprinkler in pit of hostway.
rear of bldg: there is 20ft extension, we will replace dryrotted siding approx 1500 sq ft on both sides of rear of bldg, with hardi plank lap siding, all work in rear of bldg. like for like repair.
2-story horizontal addition at the rear and side. kitchen remodel and new powder room on 2/f. new bedroom and remodeled bathrooms on 3/f. removed powder and enclosed laundry on 1/f. new front door and openings.
water proofing existing 5 balconies 2.5 feet by 5 feet (12.5 feet)each (total 62.5 sq ft) front of building.
to comply with case #202659023 to fill over excavation with concrete and stairs
addressing permit: create the address 5526 mission st. reference pa #202511129367