Search Permits
240,145 results
to obtain final inspection for work approved under pa# 202507090415. all work is complete.
revision to pa # 202604159530: re-arrange kitchen, dining room, & living room at 2/f, partial (e) footing to remain, no need to replace.
remodel 2 bathrooms, like-for-like including new vanities, lighting, tilework and plumbing fixtures; install new guardrail & ballusters @ 3rd level roof deck. no structural modifications; remove (e) floor finish and install new flooring
revision 202607104863- add scope of work water damage behind (e) siding, tear off (e) siding and prepare mositure barrier and replace siding with (n) siding in kind
remodeling the upstairs kitchen. raising the ceiling height of the kitchen within the building envelope on the 2nd floor. adding kitchenette, 2 burner on first floor
kitchen remodel-like for like, no structural changes. replace cabinets, dishwasher, sink, all in same location in the kitchen. upgade mep to code as needed
str revision to 202604229878. layout changes on both levels to include closets & rear facing wall w/ wider opening. added grade beams and replaced (e) posts with load bearing wall at lower level. remove exterior spiral stair. re-framed living room roof. add shearwalls at property line walls @ l1.
unit m305: master bathroom remodel like for like. no structural changes, no removal of walls, replace toilet, vanity. upgrade mep to code as needed.
revision to pa 202508082687 (ref 202604169569) structural changes only to 2nd fl diaphragm connections @ collector to brick walls
revision to pa #202601073409 & 201907297231: modification of fence design/height, less than 6 ft solid.
performing selective demolition of non-structural walls sections of drywall in 7 floors in hallways & apaartments units - 8th floor units, 820, 819, 818, 816, 813 & hallway. 7th floor units 719, 716, 715, 713 & hallway.6th floor units 618, 615 & hallway. 5th floor units 507, 505. 4th floor units 407
lower rear half of garage by 7" to match front. add foundation around perimeter of garage space. voluntary structural strengthening @ 1st fl.
full interior home renovation & addition of primary bedroom & ensuite bathroom include general interior finished, new flooring & wall coverings, kitchen remodel. new cabinets, countertops & appliances. remodel all bathrooms, new doors & windows, updated electrical & lighting systems,
apt#1: remodel (e) kitchen in kind.
kitchen like for like, no structural changes. replace cabinets, sink dishwasher. bathroom remodel like for like, no structural changes. replace toilets (2), sinks (2), replace fan.
revision to bpa: 202008222415 gas appliances not allowed due to pgeservice conflict in street, adjust to no fireplace and electric appliances. (door change in basement). future adu under separate pa#202201075581.
replacement of (e) front entry doors, and minor interior tenant improvement work on the ground floor.
repair water leak cut out 6"or 8" of stucco. remove existing membrane and install galvanized z bar flashing and new torch down membrane, patch stucco, prime and paint. work is in front of bldg, but not street facing.
new two story horizontal addition at rear yard, new media room and bathroom at basement level, new second story vertical addition: primary bedroom and bathroom, new exterior finishes at existing front facade, new main entry front door system at existing location, new interior renovations
to comply with nov #202655939. permit retaining wall and permit landing.
relocate (e) kitchen, bathroom, add 1 new bathroom & replace (e) sheetrock w/ new. all work on 2/f.
install refrigerator (min 12 cub ft) and 2burner stove at e 1st fl studio. restoring ground floor 2nd unit that was established in bp 9802017 on 5/28/1998.
to obtain final inspection for work approved under pa#: 202404129941. all work is complete.
to obtain final inspection for work approved under pa#: 202403157918. all work is complete.
formula retail ground floor tenant improvement - excercise use. interior work includes new non-bearning partitions, doors, finishes, ceilings, lighting, mep. exterior signage shown under seperate permit.
unit#: 3;kitchen remodel and bathroom remodel including removal of ktichen wall (non structural) replace toilet and sink in the bathroom. replace kitchen sink, dishwasher in the kitchen. update m.e.p. to code as needed.
repair stucco, fix framing, replace sliding door inkind at front right of the building. to comply with nov 202546729.
structural repair to existing roof beam at rear of the property. replace existing failed beam with new steel beam.
full bathroom remodel, in kind.
t-mobile: remove 1 (e) antenna. install 6 new antennas inside 6 new radomes. remove 1 (e) cabinet. install 2 new cabinets. install 12 new batteries. install new 200amp panel.