Search Permits
240,145 results
this a revision to an active permit # 202412096390 to record a field condition change as approved by filed inspector david l araiza. (1) restroom to remain as gender neutral & (1) designated as standard.
to obtain final inspection for work approved under pa# 202504174614. all work is complete.
interior renovation of kitchen, bathroom & powder room, relocation of (e) exterior window at exterior courtyard, no change to front facade, new skylight and in-kind (e) skylight replacement
to comply with nov#202656908 : retroactive permit application for existing fence 7'-6" & 7'-8"; remove the simple wood shade structure
kitchen remodel on 2nd/f, replace in kind 2 post w/ new pier footing as shown, new front window
to obtain final inspection for work approved under pa# 202504023592. all work is complete.
recommencement and completion of work approved under pa#'s 202410314101 and 202502261170.
to obtain final inspection for work approved under pa 202507030151. all work is complete.
Install new cold plunge pool, spa, and associated equipment at new building (PMT24-19616). New structural and electrical. Special inspection concrete construction. Results in CoC.
Installation of one set of LED front-lit pan channel lettersets mounted to the building SWEET REPEATS 37 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
Install 7 parking canopies totaling 8,905 SF at a new facility. Special Inspections required: concrete construction, welding, and soils. Results in CofC
Install one exterior wall mounted illuminated sign with pan channel letters ANN TAYLOR 34.6 Sq Ft.
Installation of two 120-gallon propane tanks. Run 7-ft of 3.25-in PE gas line from tanks to 55-ft of 3.25-in galvanized gas line to 2nd stage regulator. Install 4-ft of 3.25-in PE gas line from 2nd stage regulator to 400k BTU pool heater. Total length of run with the combined gas lines is 66-ft. Gas lines to be buried 18-in with 18-gauge tracer wire and to be installed per 2024 IFGC, 2024 NFPA 58 & FPD 6104.1.
Push Pier Foundation Repair. Special Inspection required for push pier installation.
THIS SUBMITTAL IS FOR CIVIL AND LANDSCAPE PERMIT ONLY TO SEPARATE THE WORK FROM THE NOX DEVELOPMENT PLANS. CONTACT ROBERT APODACA.
Installation of 13.50 kWh battery and Main Panel Upgrade to 400A at existing SFR. Minimum required building inspections: Electric rough in and electric final.
Installation of 157-ft of 2-in PE gas line buried 18-in with 18-gauge tracer wire from gas meter to 400K BTU pool heater. All gas lines are to be installed per 2024 IFGC & COM gas requirements. Contact COM gas engineering at 480-644-2909 to determine if the meter needs to be upgraded. Reference pool permit PMT26-08211.
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
Addition of standard 50amp circuit for Level 2 EV Charging Equipment from SES / All-In-One on north side of house to garage directly south of panel.
New 2,428 SF two-story residence with a two car garage in AVALON CROSSING. New gas, water and electric meter. See permit MST26-06692 for addenda - Code Update 2024.
add 1200A distribution board from an existing distribution board for several disconnects (2) 600a (2) 100A (3) 30A. For testing of HVAC equipment.
NEW ALUMAWOOD PERGOLA 17'-0" L X 17'-0" W X 9'-0" H
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with two outdoor cameras.
Please do not request inspections under this permit until 2 business days after permit issuance.service upgrade to 200 amps
Please do not request inspections under this permit until 2 business days after permit issuance.14 roof mounted solar panels
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF: #(1) ELECTRIC STOVE, #(1) GARBAGE DISPOSAL AND #(1) GFI
Please do not request inspections under this permit until 2 business days after permit issuance.200 amp Heavy Up
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Installing 16 new roof-mounted solar panels at 7.20kW DC
Please do not request inspections under this permit until 2 business days after permit issuance.Wire electrical outlets as per plans for new canopy