Search Permits
239,304 results
widen existing garage door opening by 1.5 foot.
unit #2: repair roof deck boards in kind. no work visible from street. less than %50
mep includes (n) heat pump, lighting, electrical, electrical, plumbing. install wsher dryer hookup on 3rd fl, new bathroom on 3rd floor. raise primary 3rd floor bedroom ceiling from 8'4"-9'. new skylights
l28: fire sprinkler as-built for bpa: 202602115780 - per inspector request.
revision 202510207666- to include update to mechincal equipment
remodel (2) bathrooms. keep (e) layout. replace bathtubs with shower pans and tile walls. replace toilets, vanity and mirrors. tile bathroom floors and new paint on walls & ceilings. like for like.
demolish/remove non-structura partition wall(s) in downstairs commercial space. convert use form medical office to design professional office.
to obtain final inspection for work approved under pa#202303103503 & 202303103505. all work is complete.
emergency (exterior) dry rot demolition to wood columns directly above underpinnig. approximately 700 sf wall.
to obtain final inspection for work approved under pa# 201904168079. all work is complete.
interior remodel of an existing 35sf bathroom in the (e) first fl. unit (38 cameo way) expansion of bathroom to approx 45 sqft. by removing (e) pocket door & adding non-bearing partions & new swing door. replacement of plumbng fixtures in kind & adding roll in shower no work to rest of unit or
to comply w/nov#: 202659648 and 202659341. remodel 2nd flr bathroom. add partition at (e) living room to create (n) media room. replace plumbing, replace shower pan, replace tile around shower pan
bathroom remodel: in kind, no layout change. replacement of all plumbing fixtures and electrical fixtures. (bathroom downstairs)
installing of new ductwork, air distribution, ervs fancoil units. modification and extension of existing fresh air. install new diffuser, grills linesets, thermostat & local controls. install outdoor condenser units. mech work for 202602236299
revision to pa #202508263944 3rd floor unit #1921 to reconfigure master bathroom, relocate non load-bearing walls, add skylight in kitchen, seal one existing window, revise lighting layout; revise all proposed door height to 96"
relocate kitchen and add (n) bathroom on all three flat units. add (n) wood beams and posts to open between kitchen and living room on all three units.
28th floor: demolition of 27th and 28th floor communicating stair to intermidiary landing and floor infill at opening in an existing unoccupied space. no hvac or electrical modifications.
repair deck due to termite bites, less than 50% inkind
convert 58 sq ft first floor storage space to full bathroom.
14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.
29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl only
4th floor:interior demo & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the commen area restrooms within the e envelope.demo/install of nw finishes & fixtures mech/electrical defer
replace existing sidewalk and supporting elevate concrete slab.
revision to pa# 202510278204. at 2nd floor unit #913 pacific ave, relocate new bathroom per plan. change bedroom to home office.
revision to 202512172010. convert open office areas to private office areas to private offices, conference room reconfiguration and additional private offices to previous tenant improvement permit.
to obtain final inspection for work approved under pa# 202406144518. all work is complete.
new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave.
ste 1675: provide and install the new exhaust fan for server room. redistribute (1) low side duct runs for new space layout for wellness room. add supplies and returns in (1) new space with reference to pa # 202608035968 & 202605111055
to obtain final inspection for work approved under pa# 202106162622, 202306160265 & 202309207017. all work is complete.
provide excavation sequence and shoring to accomodate foundation installation, reference bpa # 202512182133