Search Permits
239,304 results
to obtain final inspection for work approved under pa# 202208160664 & 202208160667. all work is complete.
voluntary seismic upgrade -no exterior changes proposed.
addition of a new french drain at the lowest level, adjacent to the rear foundation. add two catch basin at existing surface drain.
project is to replace front porch/deck and stair and add a canopy over the main entry. added square footage at porch and stair is 57 sq ft. space under porch/deck and stair is not habitable space but used for storage. project complies with planning setbacks.
unit #805: bathroom remodel. no location change, in-kind.
repair (e) front exterior stairs due to localized dry rot. remove/replae deteriorated wood components in-kind, including affected treatds, risers, stringers and/or framing as required. retain (e) staircase configuration dimensions and location. no change to use, dwelling or building footprint.
2nd fl - convert existing storage space into an office
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESU
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Remove an existing honeywell fire alarm system and install a new fire lite fire alarm system for the continued protection of the MGAA building.
Install (2) wall mounted halo illuminated signs with pan channel lettering on west and east elevations: ENDURE PILATES - 42 sf each. Total sign area 84 sq ft
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Demo partitions and identified plumbing fixtures in existing restrooms at a City of Mesa Park. New partitions and plumbing fixtures to bring restroom up to current ADA requirements. Results in CofC.
Installation of 113-ft of 1.5-in PE gas line buried 18-in with 14-gauge tracer wire from gas meter to 400K BTU pool heater. All gas lines are to be installed per 2024 IFGC & SW gas requirements. SW gas to determine if the meter needs to be upgraded.
CONSTRUCT A 504-SF SWIMMING POOL & 36-SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 84-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18-GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES ARE TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED OR NO SPA/NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MO
Install (1) exterior wall mounted illuminated sign with Channel Letters FREEWAY INSURANCE 20 Sq Ft.
CONSTRUCT A 737-SF SWIMMING POOL AND A 100-SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 80-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18-GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES ARE TO BE INSTALLED PER 2024 IFGC AND COM GAS REQUIREMENTS. COM GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY NO.
Permit is needed for Mini Split that has already been installed
Openspace gazebo
Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
Sell Firearms and ammo
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
Updating electric panel from 150A to 400A as directed by SRP
Park Model set, with 11' 6" X 35' Awning and skirting.
Construction of New conventional home. The existing mobile home was removed by previous owner.
Curb Cut
Please do not request inspections under this permit until 2 business days after permit issuance.This submission details the replacement of the existing Simplex 4100 series voice evacuation fire alarm system and all support equipment.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of roof mount solar panels.
Please do not request inspections under this permit until 2 business days after permit issuance.1 new dedicated circuit for mini-split, 1 ceiling fan, 4 receptacles and 10 recessed lights.