Search Permits
239,304 results
Construct interior alterations for one family dwelling subject to field inspection STFI.
to comply with dbi internal audit, nov #2023-07221. alterations made to original scope, ref bpa 200505192898. as built documentations to comply with sf planning enf case 2023-004008enf.
unit 612 remodeling 2 bathrooms. bathroom 1: tub to standup shower conversion. and bedroom floors carpet to lvp. paint room, change toilet and new powered medicine cabinet wall mounted. bathroom 2: like for like . placing new tiles, keeping the tub but replacing plumbing fixtures same location.
revision to pa# 202409110548: omit air filtration sytems in main unit and adu. leave door from adu to main stairway. new window at bathroom
replace a facade window, keep the (e) header. raise the window sill from 20" to 25" for safety.
#601 -bathroom remodel: tub and shower pan convention, new shower system, new tile floor, walls, new vanity, lights, shower wall, new toilet, custom storage glass door
new non-structural wall to seperate home office from family room
installation of the tower crane for the project balboa reservoir building a. the tower crane foundation permit is included in site permit addendum 1: 202503313370-s1.
10th floor: interior tenant improvement to construct new partitions, doors glazing and finishes. mep deferred.
replace (e) electrical garage door, like for like. street visible.
to comply with nov 202648960 items 2,4,6,8,12: repair damaged walls and paint; repair the overhead leaks; repair or replace the air handling fan in the lowest level of the garage; repair damaged walls and paint (1001k, d & 1001b13, d,i sfhc); remove cord wiring 1001d, e sfhc, 400.8 nec.
1st fl.interior remodel:(n) open kitchen /living room, powder room & bathroom. 2nd fl:interior renovation:(e) bedrooms,living room and bathroom and a (n) primary bathroom, closet and stair location. replacing existing windows and adding a (n) rear window, rear slider door and solatube skylights.
3/fl- construction of (n) full height non load bearing paritions, doors, glazing millwork, finishes, plumbing, associated electrical power lighting distruction associated mep and fixtures.
renovate street facade 3 rd floor balcony, finishes, doors, and windows, roof deck, infill small (3'x 5') former stair area at the rear of the 3rd floor.
revision to pa#202509094858, deatils related to simpson strong walls
bathroom remodel like for like. new tub, new sink, new vanity, new tiles. in kind remodel.
revision to pa 202607165134 follwing on-site inspection with sfdbi, revision to footing detail, staircase landings, and shear design, to accomodate actual site conditions
9/12/fl- ref 202606113030 and 202604300372- deferred submittal for seismic anchorage for fan powered box
to obtain final inspection for work approved under pa# 201008058222. all work is complete.
relocate existing appliances, put in new cabinets and new laundry at 2nd floor. no structural changes.
unit#534:interior demolition to remove previous tenants improvements including non-structural partitions,ceilings,finihes,casework and mep systems necessary to repare the space for a future tenant improvement application under separate permit.no structural work,no change to the exterior. ab-17
4/5/fl- ref ti 202606294074 deferred meps
revision to adu permit 202209192704. revise adu kitchen layout at the same location. change 2 each 2x6 6x8 sliding closet door to 4x0 ft opening at bed# 1. repair non compliant 1926 stairs less than 50% to 2/f, keep (e) tread. delete structural work under adu 202209192704 on s.20 under this permit..
@ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others.
revision to pa # 202607165151 - remove bathroom on ground floor from existing plan and remove bearing wall.
revision to approved bpa#202506128577: add 2 head burner at ground fl media room.
legalize existing ground floor sleeping and bath area including replacing existing solid entry door with new frosted safety glass door.
to obtain final inspection for work approved under pa# 202502039545. all work is complete.
kitchen and bathroom remodel- no change to layout or any structrual . new cabinetry and countertop new fixture. updated closets. bathroom-new flooring, fixtures, cabnitrey. all work in kind like for like.
add holdowns and reconstruct "in kind" dryrot front stairs.