INSTALLATION OF 158-FT OF 2-IN PE GAS LINE BURIED 18-IN WITH 14 GAUGE TRACER WIRE FROM GAS METER TO THREE 3/4-IN GAS STUBS TO SERVE LANDSCAPE ADDITIONS. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS. COM GAS ENGINEERING (480-644-2909) TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
Addition of sand volley ball area with 2 sand volleyball courts, 2 hot tubs, and 4 pickle ball courts with a canopy shade structure covering the pickleball courts.
Two (2) new electrical services, switchgear cabinet, transformer and service entrance stations (SES) for each services with screening. (2) new electric meters. Installation of 8-foot-high masonry walls with gates at the west and east sides of the building to screen the electrical equipment. Special inspection for electrical, concrete, and masonry. Results in CoC.
Interior demolition of the 4th floor including MEP work. Additionally, some exterior demolition including the partial removal of the skybridge. Ref: PMT26-12361 for the removal of 165 N Centennial Way building. Note: If shoring is required to maintain the structural stability of the bridge, special inspections will be required for the shoring construction.
Before demolition or restoration can begin, an approved method of trash containment and removal must be in place. DATE: 2/19/2026 ADDRESS: 1311 E PEPPER PL MESA DAMAGE CAUSED BY: Fire INSPECTED BY: Richard Lemcke The inspection of the site identified the following: Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A wri
Group B occupancy. Type II-B construction. 1,030 SF. Occupant load 31. Demo interior flooring, ceiling, and identified wall for new door in existing tenant suite at Mesa Gateway Airport. New commercial kitchen equipment, water lines, waste lines, and type II mechanical hood. New countertops, mill work, and signs. New architectural and MEP. Results in CofO.
This project consists of 132-units multi-family development comprising of (5) 3-stories multifamily buildings and (1) 1-story clubhouse. BLDG 1: New 3-story, type V-B construction, 28,465 SF, group R-2 occupancy, 24-unit Multifamily building with 2hr fire rated wall to separate building. Special inspection required for steel, concrete, masonry, soils, post install anchors, Fire-resistant Penetrations & Joints, elect equip 1000amps. Deferred submittal - wood trusses. Deferred fire sprinklers
CP1090GAS Underground Utility Survey - Spothole Project Order Number D026005250 Project Number CP1090GAS
new swimming pool
adding a spa seperate from the pool
Install one illuminated channel letters, on backer panel, mounted onto existing screen wall XPO 32 Sq Ft. Signs shall be installed per NEC 2023 with UL listed components.
TIDEMARK TRANSFER FROM BLD2006-06047 & BLD2006-06048. 180 SQ FT ADDITION/ENCLOSURE
AFP26-04835 This project is being submitted under the City of Mesa AFP Registrant This interior tenant renovation is within the limits of an existing Clinical Laboratory on the 1st floor of the HonorHealth Four Peaks Medical Center campus. The scope of work includes minor interior demolition, replacement of existing Lab Analyzer equipment and upgrades to the associated MPE systems, and minor finish updates. The extent of construction covers 342 sqft. There is no change to the building type, no c
Remodel kitchen. The scope of the work will include the following: Removal of seven existing windows. Resize or enlargement of one existing window opening from 3 feet to 4 feet in width. Relocation of a non-load-bearing interior wall by five feet to create a more open kitchen layout. Reconstruction using 2x4 wood framing with 5/8 inch diameter expansion anchors, standard wedge anchors, or sleeve anchors spaced a maximum of 6 feet on-center. Wall will use direct fastening methods such as powder
Main house in back of property to be completely renovated and additions to be made. Existing home to have interior spaces completely renovated, creating a more modern and open floor plan. New guest suite to be renovated into space.
Build 976 SF detached accessory dwelling unit (ADU) with MEP including new 200 amp single phase service panel.
Installation of a 16'x52' manufactured home
Construct new 5 story 164 guestroom hotel
New 360sf pre-engineer building for utility equipment to house fiberoptic cable. U Occupancy. VB Construction. Site improvement includes utilities connection, back-up generator with new gas meter. New 400A electrical service. Fire sprinklers not required.
New 144 units multi-family development comprising of 6, 3-stories buildings. Development includes detached single story leasing/clubhouse, maintenance building, mail ramada and BBQ ramada. R-2/ A-3 / B occupancies. Type VB and VA construction. Special inspection required for steel, concrete, masonry, wood, soils and anchoring. Water meters: (2) 2-inch domestic. Deferred fire sprinklers and fire alarms and gates. Civil under PMT24-03644. (Cover parking structures under separate permit.)
NEW Freestanding 8,320 S.F. Office & Aircraft Hangar. This permit includes fire alarm sprinkler monitoring. 409 NFPA Group III Hangar. DEFERRED FIRE SPRINKLERS.
New 144 units multi-family development comprising of 6, 3-stories buildings. Development includes detached single story leasing/clubhouse, maintenance building, mail ramada and BBQ ramada. R-2/ A-3 / B occupancies. Type VB and VA construction. Special inspection required for steel, concrete, masonry, wood, soils and anchoring. Water meters: (2) 2-inch domestic. Deferred fire sprinklers and fire alarms and gates. Civil under PMT24-03644. (Cover parking structures under separate permit.)
New 144 units multi-family development comprising of 6, 3-stories buildings. Development includes detached single story leasing/clubhouse, maintenance building, mail ramada and BBQ ramada. R-2/ A-3 / B occupancies. Type VB and VA construction. Special inspection required for steel, concrete, masonry, wood, soils and anchoring. Water meters: (2) 2-inch domestic. Deferred fire sprinklers and fire alarms and gates. Civil under PMT24-03644. (Cover parking structures under separate permit.)
On this property, the existing store will be remodeled, and a small kitchen will be added inside for fast food sales. Results in CoO. Also, the gas pump area will be renovated to provide service once again. The entire property will be renovated, and improvements will be made to provide quality service. All of this will be within established codes.
New 2428 SF two-story residence with a two car garage in AVALON CROSSING. New gas, water and electric meter
Limited TI for MRI replacement with Siemens 1.5 T Metgneton Sola. Scope includes new shielding, wall components, and finished. Existing building type IA with I-2 occupancy about 700 SF of area scope. Deferred fire sprinklers and fire alarm. Special inspection for concrete and post-installed anchoring. Med-gas recert hold for final. Results in CoC.
TI of existing building. New mechanical, electrical, and plumbing. 202118 SF. Group B and S-1 occupancies. Occupant load 440. Results in CoO. Deferred fire sprinklers. Deferred fire alarm.
Replacement of the existing rock wall with a new rock wall feature. No change of use or occupancy, no increase in sq. Special inspection for observations, steel, concrete, and post-installed anchors. Results in CoC.
At risk foundation and utilities only for MAZ7 building. New buildings to be submitted under separate submittals. Site utility work established in PMT22-13440C. Results in CoC.
Update windows, interior doors, new flooring, new tile in bathrooms, new cabinets and countertops and new AC system on roof. Repaint the interior and exterior of the home