Search Permits
168,742 results
Converting tub to shower. Replacing pan, drain, and valves. Using a glass door.
This submittal is to obtain a certificate of occupancy for Suite 101 only with a square footage of 44,615 S.F. It will be used for a mercantile grocery/warehouse style cash and carry business. All approved conditions and existing conditions will remain - no major work to be done under this scope. There will be no new structural, mechanical, plumbing, and electrical work to be done.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Reconfigure dedicated circuit service to AT&T campus from servicing all three buildings. Buildings Mesa One and Mesa Three will be moved to shared circuits and building Mesa Two will be served by two dedicated feeders. (“Project”)
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
New detached 1000 sq.ft. Accessory dwelling unit consisting of 2 bedrooms, 1 full bathroom, 1/2" bath, full kitchen with gas range. Will be installing a new 125 amp sub-panel and new central hvac unit.
Group B and S-1 occupancies. Type III-B construction. 20,389 SF. Occupant load 139. New partition walls to create new restroom and breakroom in an existing suite with warehouse and office space. New plumbing fixtures, waste lines, and water lines. New mechanical exhaust ducting to roof top exhaust fan and supply air ducting. New MEP and architectural. Deferred fire sprinklers and fire alarms. No Hazardous Materials or High-Piled Combustible Storage under this permit. Results in CofO.
interior demolition of building
CONSTRUCTION OF 321 SQ FT ADDITION WITH ELECTRIC AND PLUMBING FOR BATHROOM, WASHER/DRYER AND 78 SQ FT COVERED DECK. AWNING ENGINEERING PROVIDED BY CARL PUTNAM NO. 39702, EXPIRES 9-30-27. MINIMUM ONE 9-FT X 18-FT UNOBSTRUCTED PAVED PARKING REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE. 33-FT X 48-FT INTERIOR LOT. ACCESSORY STRUCTURES DO NOT EXCEED 100 PERCENT OF THE PM FLOOR AREA. ACCESSORY STRUCTURES SHALL BE REMOVED WITHIN 60 DAYS OF REMOVAL OF THE PM. PER SECTION 11-34-2(A) OF
COB26-00162: Fire loss upstairs exhaust fan in hall bathroom at existing SFR. To rebuild like for like per engineer's report and approved USAA insurance scope of repairs.
Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Remove the existing 100-amp sub panel in the garage and replace with a new sub panel like for like.
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 24-FT X 26-FT 2026 ABOVE GROUND SET CLAYTON MH SERIAL NO. BUC017864AZAB WITH A/C AT REAR.GAS. ONE 13-FT X 40-FT ATTACHED AWNING PER ICCESR 1398. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MIN TWO 9-FT X 18-FT W/ ONE SPACE MUST BE COVERED, PAVED WITH 2-IN OF ASPHALT OR 4-IN OF CONCRETE, UNOBSTRUCTED PARKING SPACES BEHIND FRONT SETBACK. 44-FT X 81-FT PERIMETER LOT. MIN SETBACKS: 1-FT FRONT, 4-FT REAR, 3-FT MH SIDE, 1-FT AWNING SIDE, MI
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
TI in an existing construction type V-B shell suite. 3,400 SF, A-2 occupancy. Tenant fit out and covered patio roof for Restaurant. Special inspection for post-installed anchoring, steel, and concrete. Deferred fire sprinklers, hood fire suppression, CO2 monitoring system. Fire alarm(monitoring) under separate related permit. Results in CoO.
Fabricate & Install (1) Non-Illuminated Aluminum Panel
CONSTRUCT A 281 SF SWIMMING POOL & 54 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 2-IN PE PIPE FROM EXISTING GAS METER TO 1ST TEE, 2-IN PE PIPE FROM 1ST TEE TO 2ND TEE, 2-IN PE PIPE FROM 2ND TEE TO 400K BTU POOL HEATER, 1-IN PE PIPE FROM 2ND TEE TO 100K BTU BBQ, 1-IN PE PIPE FROM 1ST TEE TO 3RD TEE, 3/4 PE PIPE FROM 3RD TEE TO 1ST 75K BTU FIRE WOK, AND 3/4-IN PE PIPE FROM 3RD TEE TO 2ND 75K BTU FIRE WOK. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF
Modify existing fire alarm system by adding a new Fire Alarm Control Panel with cellular communicator, ceiling-mounted strobes, ceiling mounted horn/strobes, duct detector, and relocating ceiling-mounted horn/strobes for remodel/addition. This permit is for fire alarms only. Approved as noted.
New Construction - Single Family Residency
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Relocate existing electric water heater from laundry room to southeast corner of garage at existing SFR. Reuse existing hot, cold lines via attic and reuse existing T&P line. Relocate Rheem ProTerra HPWH (XE50T10H45U1) on 18-inch stand with expansion tank and dedicated condensate drain to exterior.
CONSTRUCT A 306 SF SWIMMING POOL NO SPA/NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
New data center civil site improvements. Installation of all off-site improvements and street frontage landscaping during the first phase of construction.
New 7,024 gray shell building, 2,800 SF patio, and 567 SF canopies (10,391 SF total) for future B, A, and M occupancies. New 1000A 3 phase electrical meter, gas meter, and 1,500 gallon grease interceptor. (5) new mechanical heat pump RTUs. New civil, structural, architectural, MEP, and Fire Protection (fire alarm and fire sprinklers). Deferred submittal: wood trusses. Special inspections required: Electrical performance test, concrete construction, steel construction, fabricated items, post-inst
New Pool and Spa with 60amp pool panel and propane heater
14x18 BBQ Ramada with a gas cooktop and sink and a 18x18 RV Cover with no utlities
Install (2) new motorized dampers and an exhaust fan on the roof of existing building. New equipment will connect existing manufacturing operation to new manufacturing facility currently being constructed. New electrical. Results in CofC.
Power Plus will provide and install (1) 600A 120/208V 3PH U/G SES to match utility source to provide temporary power to job site.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES