Search Permits
249,120 results
ePlan: Residential Expedited Review - New THREE UNIT RES. New construction of a 3-Story Duplex Unit Unit 1B [3bed 3.5bath] with attached Carport
PB: New construction of 2 story SFR 4 bed 4.5 bath with attached garage front covered porch and rear covered patio
Replacement of complete existing central heat and air system with or without duct work
100/125amp panel 200 amp meter base grounding and bonding
Interior Remodel - The Unisex Restroom will remain available while the Men & Ladies Room are under construction. Once they are completed the Unisex Restroom will be remodeled.
BASE: Installing a backup battery system and additional meter socket.
Avery - 40-23269 - Install new 11.4kW rooftop solar system to existing residential only using backfed breaker only.
New construction of 2 story sfr with 4 beds 3.5 baths attached 2 car garage covered entry porch and patio PUD
ETJ TEMP POWER
Installation of Building UPS System for Building 2000
Replacement of complete existing central heat and air system with or without duct work
Per Tx Gas they want us to relocate the gas meter 15 away from hazardous confined space and window opening.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport. BLDG 2
Bldg 2 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport
EXPRESS: Removal of limited drywall for internal wall construction review removal of flooring trim inspection of subfloor inspection of existing foundation for eventual addition
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 1 New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport
ePlan: Residential Expedited Review - New construction of a 3-Story Duplex [3bed 3.5bath] with Attached Carport. UNIT 1B
Replacement of complete existing central heat and air system with or without duct work
Construct new driveway approach of 13.75 FT. No sidewalk inspection per plan review.
Replacement of complete existing central heat and air system with or without duct work
Express- Replace 2 windows like for like. No structural change.
Remodel 2 story garage apartment. Upstairs Unit: Replace 2 exterior doors kitchen countertop plumbing fixtures and light fixtures; paint interior walls finish flooring downstairs Unit: Demo and redo bathroom (make it bigger new drywall wiring water and sewer lines) replace kitchen relocate 1 window install 1 window. Install 2 new interior doors. Install new flooring replace HVAC light and plumbing fixtures paint interior walls. Repair exterior deck. Add interior stairs
EPLAN - Remodel for Labs servery and IT -1st Floor.
Remove existing pool and replace with a new pool with the same specifications.
Interior remodel of SFR
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport. BLDG 1
Remodel/addition to existing unit within a three unit residential site at 2210 willow street. Work shown includes removal of the non complying portion removal of existing carport First floor addition second floor addition interior remodel new modified walkway/site improvements and related MEP work.
homebuilder loop Ref 2026-125180 BP
Interior remodel to existing admin office to include private offices conference rooms and breakroom. Mid-level finish level. No access control. No COM Checks Required.