Search Permits
249,120 results
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Abandon the existing grease interceptor and install new one no relocation.
New accessory structure No sink outside of bathroom. Not a dwelling.
Change exter panels from Fed Pac to safer panels
ePlan: Commercial Expedited Review - Phase 2: Interior Remodel to Existing Manufacturing Facility (20000 SF).
EXPRESS: Demo and remodel the shower stall area convert from shower to tub. Redo floor tile. Re use base port trim toilet vanity Includes waterproofing shower valve piping Tub trim.
Install Underground Fireline and Riser
Installation of 5.72kw Solar PV system with Battery backup.
Express: Replace 6 existing windows (like for like)
Unit 102 New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport
ETJ. BASE: Installing a backup battery system and additional meter socket.
ETJ TEMP POWER
ePlan: Residential Expedited Review - New construction of a 3-Story Triplex [3bed 3.5bath] with Attached Carport. UNIT 103
EMERGENCY **AURA HIGH POINTE APARTMENTS**breaker failure on Main Distribution- bldg. 4 - no power- our building has four panels that are out or partially out leaving the Bldg. without power- it affects 21 residents. THE CITY OF AUSTIN IS ON SITE -NEED TO REPLACE POWER BREAKER**
Replacement of complete existing central heat and air system with or without duct work
Interior Renovation to accommodate Temporary Offices
ePlan: Residential Expedited Review - New construction of a 3-Story Duplex. [3bed 3.5bath] with Attached Carport. BLDG 2A
Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be two access holes: one in front and one on the side.
Interior remodel of flex office space
Replacement of complete existing central heat and air system with or without duct work
Trench/ run 8 of poly to generator
Interior remodel of mater bathroom and living room.
BASE: Installing a backup battery system and additional meter socket.
Interior Remodel - Restrooms - The Unisex Restroom will remain available while the Men & Ladies Room are under Construction. Once they are completed the unisex restroom will be remodeled.
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 2
Express: Installing 22 Steel hybrid piers 3 exterior breakouts and 6 Interior breakouts
Total demo of 2493 SqFt SFR circa 1939
Interior Remodel - Game Testing Coffee Bar and Game Observation Room.
TWO-STORY SFR WITH GARAGE AND A COVERED PATIO. 3BED 2.5 BATH