Search Permits
248,074 results
ePlan: Commercial Expedited Review - [CONCURRENT] New Construction of New Apartments (35745 SF).
Replacement of complete existing central heat and air system with or without duct work
home builder loop ref 2026-057083 EP single residence
installing a whole home standby generator with an automatic transfer switch no meter work
We will excavate and tunnel approximately 3 feet underneath the pier-and-beam home to access the existing cast-iron drainage system. Once exposed we will remove the leaking cast-iron tee fittings and defective sections of piping.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 609
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Replacing two brass body RPZS (reduced pressure zone) backflow preventers with stainless steel body RPZS. These devices are located in the surgery center.
PH2: Install additional new 5.1kW rooftop solar system for existing residential only.
Temporary Homebuilders Power Loop during construction
Boone S413 C Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Full service upgrade
ePlan: Commercial Expedited Review - New Construction of New Carport (945 SF).
Install Level 2 EV Charger
100amp outdoor main breaker panel replacement. No meter work. AE is the electrical provider.
ePlan: Commercial Expedited Review - [CONCURRENT] New Construction of New Apartments (33676 SF).
ePlan: Commercial Expedited Review - New Construction of New Carport (945 SF).
New pool 10 x 20 with plumbing permit
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review -New Construction of New Trash Enclosure (208 SF).
Installing a new irrigation system
Replacement of an existing water heater Remove and replace Water Heater - 40 gal Gas
ePlan: Commercial Expedited Review - [CONCURRENT] New Construction of New Apartments (34436 SF).
Interior remodel of 2100 sqft of existing boxing gym space. Create a new pilates and Yoga studio completed in 1 phase.
METER CAN AND 200A PANEL REPLACEMENT
Upgrade to 200amp
Express- Bathroom remodel including changing shower valves and bathtub valves retile bathrooms. Kitchen remodel including changing cabinets and installing new appliances. No moving water or gas fixtures. Replace damaged siding.
ePlan: Residential Expedited Review - New Construction of 3-Story Secondary Res. [3bed 2.5bath] with attached carport Existing Res to remain as is.
7 DAY - Interior remodel of existing office. no access control - OVA
*partial demo* New exterior stairs replace roof & rear deck interior remodel Notary to be confirmed