Search Permits
248,074 results
WINDMORE PHASE 2, BLK K, LOT 1
EASTRIDGE PHASE 7, BLK G, LOT 73
EASTRIDGE PHASE 6, BLK E, LOT 20
SOUTHRIDGE PHASE 4, BLK J, LOT 114
SOUTHRIDGE PHASE 4, BLK U, LOT 36; * (SBISD) *
EASTRIDGE PHASE 6, BLOCK D, LOT 14, ACRES 0.1100
SOUTHRIDGE PHASE 4, BLK U, LOT 35; * (SBISD) *
WINDMORE PHASE 2, BLOCK K, LOT 2
SOUTHRIDGE PHASE 4, BLK U, LOT 37; * (SBISD) *
EASTRIDGE PHASE 6, BLK C, LOT 18
mechanical_fuel_gas
temporary pole for new construction for Stoney Chase Ref 2026-123831 BP
BLDG 2: New 3-story detached residence 3 bedroom 2.5 bathroom Part of 3-unit use.
Interior remodel combining existing side-by-side half bath and full bath into one single primary bath. The basic area footprint of the bathroom space is not changing in size. Additional sheetrock work needed in the hallway outside the bathroom to enclose the area that previously housed the old HVAC system. A new unit was relocated and installed in the attic.
ePlan: Commercial Expedited Review -New Construction of New Carport (945 SF).
Addition of SFR
ePlan: Commercial Expedited Review - New Construction of New Detached Garage (2059 SF).
Express: Existing foundation repair as per scope of work attached.
Excavate 40 to repair break in the yard line
*Smart Housing*Green Building* New construction single-family residential Condo 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio.
ePlan: Commercial Expedited Review - New Construction of New Carport (945 SF).
ePlan: Commercial Expedited Review -New Construction of New Trash Enclosure (208 SF).
Garage conversion to game room. 400 sf Build a wall behind of the Garage doors 20 wide by 8 tall and add a window 3 x 5 Install 4 recessed lights and 9 outlets. Install on the wall new R-13 Insulation Sheet rock Tape Float and Paint Install new mini split new laminated Flooring
Bathroom addition to existing 1-story single family residence. New bath includes 2 sinks 1 wc 1 shower new windows new framing new siding new foundation and roof. 3 bed/2 bath
Repipe whole home domestic water system
Boone S413 C Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
installing a dedicated gas line for a whole home standby generator natural gas
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
100amp outdoor main breaker panel replacement. No meter work. AE is the electrical provider.
Excavate 31 tunnel to repair the main drain under the house / excavate 57 trench to repair the main drain line in the yard