Search Permits
247,532 results
Low Voltage
Plumbing
Generators
Generators
Generators
Generators
Generators
Gas
Interior/Exterior Work
Electrical
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: FACTORY/INDUSTRIAL. START DATE: 11/1/2026. END DATE: 12/1/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
FULL REBUILD (SAME AS EXISTING) FOR WOOD PORCH (OPEN) (QUANTITY: 1, LOCATION: REAR OF BUILDING).
SCOPE: ROOF REPLACEMENT. AREA: 2313 SQ. FT. ROOF COVERING: ASPHALT SHINGLES. LOCATION: AT TOP OF THE ROOF. IL ROOFING CONTRACTOR LICENSE: 104.02017.
LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: COMMON AREA, BACK YARD..
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 680 SQ. FT., LINTEL QTY. 8, MAX. LENGTH 10. LOCATION: MASONRY REPAIR AND LINTELS REPLACEMENT.
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 30 . LIGHTING OUTLETS: 15. SPECIFIC LOCATION: BASEMENT,1ST AND 2ND FLOORS.
unknown
new_construction
mechanical_fuel_gas
mechanical_fuel_gas
construction_loop
electrical_service_/_circuit_/_feeder
Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT.
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [3bed 2bath] Work to include: First floor Interior remodel First floor addition new bed new bath [4bed 3bath].
2026/10/02 - 2026/10/04 - Weekend 1| 2026/10/09 - 2026/10/11 - Weekend 2 | (2026/09/14) | Music stages food vendors art vendors & hospitality programs. October 2-4 & 9-11 2026 in Zilker Park.
Total demo of duplex 2903 sqft circa 1932
7 DAY - INTERIORE REMODEL TO EXISTING OFFICE SUITE WITH MEP SCOPE. NO ACCESS CONTROL. JBOX ROUGH IN ONLY FUTURE TENANT WILL APPLY FOR ACCESS CONTROL. - OVA
Replacement of complete existing central heat and air system with or without duct work
ETJ - New Construction of Tiny Home Master Water Tap: 2024-135380 W
ETJ - New Construction of Tiny Home Master Water Tap: 2024-135380 W