Search Permits
182,337 results
New Service for SFR in ETJ
Reroof replacing like for like asphalt shingles.
Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be two access holds in front of and behind the house.
Repair plumbing underneath bathroom after tunnel is dug to expose the plumbing pipes underneath the home.
Irrigation
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
Interior Non Structural Demolition
7 DAY - Electrical: adding power for 3 ovens + 3 hoods New main gas line + 3 supply lines Replacement of Complete duct system only Adding intake/exhaust duct for (3) ovens along with (6) new fans AT EXISTING BUSINESS - OVA
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
Proposed 640 sq ft Pre Fab building that is state approved with electrical service to the bathroom. Site Plan reference SP-2025-0254C (Restroom)
Minor interior remodel for existing Medical Office.
Replacement of complete existing central heat and air system with or without duct work
new construction - NEW CONSTRUCTION OF 3-STORY SINGLE FAMILY HOUSE WITH DETACHED OFFICE ATTAHCED CARPORT WITH EXTERIOR STORAGE POOL AND SPA WITH AUTOFILL DETACHED ADU GUEST SUITE (SECOND DWELLING UNIT) WITH POOL BATHROOM AND KITCHENETTE COVERED POOL PATIO WITH OUTDOOR KITCHEN
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
ETJ New Construction of SFR 3786 SQFT meter installation
Interior non-structural demo (3rd floor)
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
Replacement of an existing water heater
re roof
5405 Blue Bird Lane. New 2-story 3 bedroom 3 bathroom dwelling unit with attached garage covered front porch and rear covered patio.
Replacement of an existing water heater Replacement of Two (2) NG Water Heaters Like for Like
Reroof replacing like for like asphalt shingles.
*Green Building* New 2-story 4 bedroom 3 bathroom single family residence with attached garage covered front porch and rear covered patio.
Garner S401 A Right New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Drywall kitchen bathrooms flooring & painting due to Fire/Water Damage for 5 Units
Interior Finish Out to create a Medical Office
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
New pool for detached condominium residence with new walkway a patio & pool equipment pad.
Replacement of an existing water heater Replace 50 Gallon Electric Water Heater [Outdoor Closet