Search Permits
182,337 results
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 3 - Demolition and renovation of new parlor area.
Replacement of complete existing central heat and air system with or without duct work
Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications
Interior Finish Out to create a Medical Office
Gday we need to upgrade an existing duplex service as the incoming line is low and we need to group meters.
Replacement of complete existing central heat and air system with or without duct work
New Construction in the ETJ SFR
Replacement of complete existing central heat and air system with or without duct work Rick Conner
Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage closet
New Construction in the ETJ SFR
Porch Enclosure- enclose existing porch on two sides with windows and door. Match existing siding on exterior. Install new flooring over wood deck. Insulate and sheetrock.
Addition of new D wall to create suite 330 from approx. (3426 F) of existing interior space.
Replacement of complete existing central heat and air system with or without duct work
new construction in the ETJ SFR
Updating electrical service ILO of ragloop
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 1-STORY 4 BEDROOM WITH 3 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect Strangers (restaurant) vestibule and bar services areas.
Run Ducting and roof vent to an existing microwave appliance
Express: Re-roof - material change (tile to metal) (Located in WUI) Revision: Re-deck. Tear off beginning on Monday 6/22
New Pool in ground
Replacement of complete existing central heat and air system with or without duct work
Total Demo of SFR 2500 sqft circa 1981
Replacement of an existing water heater We are changing out the tank gas water heater for a similar model
PB - New construction. 2 story 3 bed 2.5 bath with attached garage covered front porch and rear covered patio
New portable and flatwork. 2026-067987 DA.
ePlan: Residential Expedited Review - New pool
ePlan: Residential Expedited Review - New Construction of 2-Story Single Family Res [5bed 4.5bath] with Habitable Attic and attached garage
Replacement of complete existing central heat and air system with or without duct work
Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications
Addition and remodel to an existing single-family residence. Scope includes reconfiguring interior layout and adding conditioned sq ft for new kitchen + new attached garage. The existing attached deck will be demolished.