Search Permits
182,337 results
ePlan: Commercial Expedited Review - New Construction of 3 Shell Buildings with Mezzanine (13429 SF).
Replacement of complete existing central heat and air system with or without duct work
Spot repair on existing sewer yard line. Less than 10 ft.
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 1-STORY 3 BEDROOM WITH 2 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO
New 2-Story Single Family Residence 3 or 4 bedrooms 3.5 bathrooms and a 3 Car Garage Covered Entry Porch & Patio.
EXPRESS: Replacing 1 window and 1 door like for like
Replacement of furnace only
Express: Tub to shower (prefab base) in the same location
Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing lighting fixtures switches and outlets as needed. No new circuits or service changes. (5) Applications
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor.
Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage
Replacement of complete existing central heat and air system with or without duct work
Running waste and water lines from newer existing piping to new city taps recently installed on property line.
Replacement of complete existing central heat and air system with or without duct work
EMERGENCY REPAIR TO RISER ONLY FROM STORM DAMAGE. AE PULLED METER REPAIR WAS COMPLETED AND INSPECTED BY COA INSPECTOR SEAN MCMULLIN AND AE RECONNECTED SERVICE
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work replacement of hvac system
Interior remodel including kitchen and bathroom updates Replacement of fixtures finishes flooring and cabinetry Interior reconfiguration in the living room area including modification of a load bearing wall. No change to building footprint or exterior walls.
irrigation for lawn
Interior alteration of existing space (Suite 360 approx 6508) (Suite 365 approx 1083) and new D wall to create Suite 380 (approx 2179 sf) Floor 3
PUD New SFR 2- Story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio
Replacement of complete existing central heat and air system with or without duct work
Upgrading the main service panel to 200A
Services upgrade from a 150AMPS to a 200AMP
200amp OH services build
Replacement of complete existing central heat and air system with or without duct work
New im-ground pool to rear of existing SFR
irrigation for lawn
Replacement of complete existing central heat and air system with or without duct work
Pickle Elementary - Install two shade structures.