Search Permits
257,316 results
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Supported scaffold installation as per plans filed herewith.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD/ STAIR TOWER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Install of temp inflatable sculpture, no alt to exist structures for Cat in the Hat at Times Sq Pedestrian Plaza. No TPA reqd. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
Modification of sprinkler heads and related piping
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - BJ'S WHOLESALE CLUB. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Proposed renovation & mechanical work of existing residential building with partition work and finish work as per plan. No change in use, egress, or occupancy.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
MODIFY THE EXISTING SPRINKLER SYSTEM AS INDICATED ON PLANS. RELOCATE/REPLACE EXISTING CONCEALED PENDANT SPRINKLER HEADS WITH NEW UPRIGHT SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modifications to sprinkler system & related piping. No change in use, egress or occupancy.
PROPOSED INTERIOR RENOVATION ON FIRST FLOOR
INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILING FOR INSTALLATION OF 8'-0 PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION TO APPLICATION B01481187-I1
Installation of a new 3-piece bathroom.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
PROPOSED REPLACING HEATING & COOLING PACKAGED UNIT ON THE ROOF. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS.
INSTALL NEW TEMPORARY CONSTRUCTION FENCE ONLY,
Alterations to sprinkler system in suites on 16th floor as per plans. No change to use, egress or occupancy.
FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR DEMO OF 8TH, 9TH, AND 10TH FLOORS AS PER PLANS SUBMITTED HEREWITH.
EXISTING 2 FAMILY HOUSE WITH PLUMBING WORK AT CELLAR,BASEMENT,1ST AND 2ND FLOOR.JOB FILED TO RELATED TO ATL 2 APPLICATION #B01481115-I1.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR ALTERATIONS TO EXISTING TENANT COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
PROPOSED PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE FIFTH FLOOR IN CONJUNCTION WITH THE ALTERATION APPLICATION FILED UNDER JOB # M01464128-I1 (MASON TRIBECA)
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Temporary and portable saunas at Domino Square for a seasonal program. Removed at the end of the programing. No changes to existing structures, use or egress.
Modifications to the existing Sprinkler System: Remove (388) existing sprinkler heads and install (44) new sprinkler heads and associated piping on the 32nd Floor as per plans (Holland & Knight - Demo Phase.) No change to use, egress or occupancy.
Installation of temporary single personnel hoist as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.