PermitDig

Search Permits

257,316 results

Plumbing and sprinkler specifications filed in conjunction with NB application X01388820-I1

2095 TILLOTSON AVENUE, Bronx
Nov 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

60-59 MYRTLE AVENUE, Queens
1KNov 5

Installation of suspended scaffold for facade repair & inspection.

1407 BROADWAY, Manhattan
Nov 5

INSTALLATION OF OVERHEAD PROTECTION AND ROOF PROTECTION AS SHONW ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022B.C

2635 EAST 23 STREET, Brooklyn
4KNov 5

INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.

1187 OCEAN AVENUE, Brooklyn
5KNov 5

PROPOSED PLUMBING

537 BEACH 130 STREET, Queens
10KNov 5

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1485 UNION STREET, Brooklyn
1KNov 5

INSTALLATION OF PIPE SCAFFOLDING AND SYSTEM BEAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

3301 FOSTER AVENUE, Brooklyn
10KNov 5

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

35-11 42 STREET, Queens
4KNov 5

RENOVATON OF THE CELLAR, 1ST & 2ND FLOORWITH THE ADDITION OF AN ELEVATOR MACHINEROOM ON THE 3RD FLOOR. APPROX. 10,882 SQ.FT. CHANGES TO USE, EGRESS AND OCCUPANCY

125 WEST 45 STREET, Manhattan
2.4MNov 5

INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

129 BEACH 118 STREET, Queens
9KNov 5

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

257 EAST 201 STREET, Bronx
0KNov 5

INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.

430 WEST 37 STREET, Manhattan
Nov 5

INSTALL NEW HVAC SYSTEM FOR THE BUILDING, NO CHANGE IN USE, EGRESS AND OCCUPANCY.

108-37 JEWEL AVENUE, Queens
50KNov 5

Installation of Supported scaffold in conjunction with Full Demo job# B01352987. No change in use egress or occupacny. We Shall comply with chapter 33 of 2022 B>C

2635 EAST 23 STREET, Brooklyn
4KNov 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

157 FRANKLIN AVENUE, Brooklyn
1KNov 5

Install (3) 12K BTU Ceiling Cassettes with 36K BTU Condenser new install with Fresh Air intake. No change to occupancy, use or egress

31-01 20 AVENUE, Queens
30KNov 5

FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.

600 WEST 116 STREET, Manhattan
Nov 5

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

95-28 147 PLACE, Queens
4KNov 5

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

528 RIVERSIDE DRIVE, Manhattan
30KNov 5

TEMPORARY INSTALLATION & USE OF SUPPORTED SCAFFOLD AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

33 PERRY STREET, Manhattan
3KNov 5

INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.

225 SEIGEL STREET, Brooklyn
7KNov 5

INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK

217 BEACH 17 STREET, Queens
112KNov 5

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

95-28 147 PLACE, Queens
0KNov 5

INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING NEW BUILDING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.

251 EAST 121 STREET, Manhattan
5KNov 5

Plumbing and sprinkler specifications filed in conjunction with NB application X01388820-I1

2095 TILLOTSON AVENUE, Bronx
Nov 5

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

3303 FOSTER AVENUE, Brooklyn
10KNov 5

INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.

6 HOWARD AVENUE, Brooklyn
Nov 5

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

2928 BRIGGS AVENUE, Bronx
8KNov 5

Modification to existing domestic water piping as shown on drawings. No change in use, egress or occupancy.

500 WEST 33 STREET, Manhattan
12KNov 5