Search Permits
253,630 results
Install of temp seasonal performance platform and rain tent, no alt to exist structures for The Yard. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
INSTALLATION OF PLUMBING FIXTURES FOR NEW OFFICE LAYOUT: EXAM SINKS, TOILETS, LAV'., AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL WORK IN APT 10A
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
INTERIOR RENOVATION AT ONE APARTMENT IN AN EXISTING CONDOMINIUM.. (1) NEW WC., (1) NEW LAV., (1) NEW SHOWER (1) RELOCATED W/D. REPLACE (1) SHOWER W/ BATHTUB. THIS IS A GAS BUILDING.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
NYU LANGONE HEALTH - FGP ROTHMAN EXPANSION - SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
CAP & REMOVED PLUMBING FIXTURES AS SHOWN ON PLAN AT THREE FAMILY DWELLING UNITS OF CELLAR FLOOR ONLY. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Mechanical work as shown on plans
MEHCANICAL MODIFICATIONS TAKING PLACE IN SUB CELLAR AND SUB-CELLAR 2 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of solar panels, rooftop, grid tied, railed, 16 modules, 6.88 KW
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Install mechanical systems in conjunction with Q01281649-I1. There is no change in use, occupancy, or egress.
REPLACE BOILER AND OIL BURNER.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
This alteration is being filed for the replacement of the boiler equipment. There are no change in use, egress or occupancy under this application.
REPLACE STANDPIPE PIPING AND INSTALL SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
VERTICAL ENLARGEMENT AND CONVERSION OF AN EXISTING 6-STORY COMMERCIAL BUILDING INTO A RESIDENTIAL 11-STORY BUILDING
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
New 17 Story residential building
Suspended scaffold outrigger installation for Facade Restoration works
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, FRAMES, CEILINGS, FLOORING AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
SPRINKLER MODIFICATIONS FILED FOR SPRINKLER INSTALLED FOR TENANT FIT-OUT ON FIRST FLOOR
INTERIOR RENOVATION OF EXISTING OFFICE ON 2ND FLOOR AND 3RD FLOORAS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
SPEAR - INSTALLATION OF INTERIOR PARTITONS, FLOORING, CEILINGS, AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF NEW PLUMBING SERVICES /FIXTURES & ASSOCIATED PIPING/EQUIPMENTASSOCIATED WITH NB APPLICATION
RENOVATION ONLY AT THREE FAMILY DWELLING HOUSE OF CELLAR FLOOR. NO CHANGE IN USE OF EGRESS & OCCUPANCY.