Search Permits
253,630 results
Plumbing application filed for the related plumbing portion (gas & water connections) of the boiler replacement work on the 11th Floor as filed under boiler application M0410805-I1 & S1. no change in use or egress.
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
Renovation of existing commercial space to install a new exhaust ductwork system, etc. No change of use, egress or occupancy.
Construction work on the 11th floor (Linklaters) as indicated on drawings.
GENERAL CONSTRUCTION TAKING PLACE ON 29TH FL (CONSTRUCTION / 30TH FL (MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Interior renovation of Unit 14 located on Floor 005 including new finishes, fixtures, and appliances. No change in use, occupancy, or egress.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
EXISTING 1 FAMILY HOUSE WITH PLUMBING WORK AT BASEMENT,1 ST AND 2ND FLOOR. JOB FILED TO RELATED TO ALT2 APPLICATION# B01417121-I1.2. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THISAPPLICATION.
Mechanical modifications on 13th floor as per plans filed herewith. No change in use, egress or occupancy.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
INTERIOR RENOVATION TO EXISTING OFFICE SPACE, PARTIAL DEMOLITION TO PREPARE FOR TENANT FIT OUT. WORK INCLUDE GENERAL CONSTRUCTION. NO CHANGE TO USE EGRESS OR OCCUPANCY.
INSTALLATION OF SPLIT SYSTEM AIR CONDITIONING UNITS AND RELATED AIR DIVICES, BRANCH CONTROLLERS, AND STEAM RADIATORS.
Minor partition with general carpentry and plumbing work in apt 2W . No change to use, bulk or egress.
17 Story residential building
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
FILED PLUMBING WORK OF A 2-FAMILY HOUSE. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
Filing herewith Alteration-CO (Alt-CO) for new outdoor theater building erected on Damrosch Park at 61 Amsterdam Avenue (Block 1134, Tax Lot 10) as an enlargement of 140-146 West 65th Street (Block 1134, Tax Lot 1).
TO INSTALL NEW SPLIT UNITS FOR EXISTING COMMERCIAL SPACE WITH MECHANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
PROPOSED COVERED PORCH IN THE FRONT OF HOUSE, RELOCATE BAY WINDOW AND FRONT DOOR
IT IS PROPOSED TO RENOVATE THE EXISTING CELLAR AND FIRST FLOOR FOR THE NEW TENANT AS SHOWN ON THE PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Job filed for installation of split AC unit. No change of use, egress, or occupancy under this application.
Install Temporary Standpipe during construction of high rise building.
INSTALLATION OF TEMPORARY WOOD CONSTRUCTION FENCE FOR AN EXISTING COMMERCIAL SPACE.
Renovation of the 2nd-floor mechanical room, as well as the roof portion where the mechanical equipment is located, is associated with the General Construction scope. No change is use, wegress, or occupancy under this application.
PLUMBING WORK IN COMBINED RENOVATION OF APARTMENTS 8D AND 8E. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
Installation of solar panels, rooftop, grid tied, railed, 11 modules, 4.51 KW
HEREBY FILING FOR RENOVATION OF COMMERCIAL SPACE (RANDYS). INSTALLATION OF PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL PLANS FOR PROPOSED RENOVATION OF THREE-STORY RESIDENCES.
Mechanical work as shown on plans filed herewith. No change to use or occupancy.
Interior renovations of existing residential unit, including gut renovation of kitchenette, main bathroom, and powder room.