Search Permits
251,849 results
STORE FRONT WORK OF RETAIL SPACE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
UNDERPINNING FILED IN CONJUNCTION WITH GC # B01220978-I1.
FENCE APPLICATION FILED IN CONJUNCTION WITH 293 & 297 WOODVALE AVENUE. APPLICATIONS # S01282908-i1 (293 WOODVALE AVENUE) AND S01283752-I1 (297 WOODVALE AVENUE).
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - ALDI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Replacement of plumbing fixtures and branch lines to the risers as per drawings.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
INSPECTION & FISP REPAIRS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY
CD-5: SUSPENDED SCAFFOLDING DURING WINDOW/ROOF REPLACEMENT, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of material hoist and suspended scaffold for facade inspection/repair.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Proposed eleven (11) story + cellar and sub-cellar residential use building. (Sub-cellar, cellar, 1-3 construction floors, 4C/5M, 5C/6M, 6C/7M, 7C/8M, 8C/9M, 9C/10M, 10C/PT1M, 11C/PT2M.)
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
Mechanical means will assist with demolition of structure
Replace existing metal roll-up gate and vertical support, partial section of aluminum store front frame and broken glass due to car accident. Comply with NYC DOB Violation VIO026-00869 as per plans. No change to existing occupancy use or egress.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Mechanical work on the 31st floors as indicated on drawings.
R80, INSTALLATION OF +/- 108 LINEAR FEET OF TEMPORARY POST INSTALLED CHAIN LINK FENCE TO ENCLOSE THE TEMPORARY CHILLER TRAILER AND THE TEMPORARY GENERATOR ON BEHALF OF CONTRACTOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PLUMBING PIPING MODIFICATIONS FOR FIRST FLOOR MEETING ROOM SPACES AS PER PLANS FILED HEREWITH.
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION # X01099316-I1
MECHANICAL MODIFICATIONS TAKING PLACE ON 14TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
APPLICATION FILED HEREWITH FOR INTERIOR DEMO WORK TO AN EXISTING FIVE STORY BUILDING
SPRINKLER MODIFICATIONS FOR GROUND FLOOR MEETING ROOMS AS PER PLANS FILED HEREWITH.
INSTALLATION OF TEMPORARY 8' PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
CONSTRUCTION FENCE FILED SUBSEQUENT TO ALT CO APPLICATION #B01324918-I1
PLUMBING FIXTURES INSTALLATION AND ASSOCIATED PPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
PROPOSED DECK AT AN EXISTING 1-FAMILY DETACHED RESIDENCE AS PER PLANS SUBMITTED HEREWITH.
Alteration herewith filed for renovation of at existing apartment 37A on the third floor of an existing 119 families, mixed use building. Work includes renovation of existing kitchen, existing bathrooms. No change in occupancy, use, egress, and bulk.