PermitDig

Search Permits

251,849 results

Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

205 WEST 115 STREET, Manhattan
3KJun 30

Installation of a temporary Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

1040 5 AVENUE, Manhattan
3KJun 30

CONVERT EXISTING COMMERCIAL USE TO RESIDENTIAL ON 1ST FLOOR. NO CHANGE TO OTHER FLOOR.

313 PARK AVENUE, Brooklyn
1.5MJun 30

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

116 WEST 31 STREET, Manhattan
8KJun 30

INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.SIDEWALK SHED FILED ON A SEPARATE APPLICATION.

1144 1 AVENUE, Manhattan
17KJun 30

INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

590 UNION STREET, Brooklyn
12KJun 30

Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

1040 5 AVENUE, Manhattan
3KJun 30

TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

126 MANHATTAN AVENUE, Brooklyn
3KJun 30

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

1309 MADISON AVENUE, Manhattan
0KJun 30

PLUMBING WORK IN CONJUNCTION WITH ALT-CO APPLICATION Q01331319-I1

178-15 CROYDON ROAD, Queens
113KJun 30

Construction fence located on the sidewalk.

200 VARICK STREET, Manhattan
10KJun 30

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

3227 FAR ROCKAWAY BOULEVARD, Queens
0KJun 30

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

33 EAST 208 STREET, Bronx
5KJun 30

Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

448 6 STREET, Brooklyn
4KJun 30

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

200 WEST 135 STREET, Manhattan
7KJun 30

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

221 WEST 134 STREET, Manhattan
8KJun 30

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

107 EAST 89 STREET, Manhattan
15KJun 30

INTERIOR RENOVAION OF THE THIRD FLOOR INCLUDING MINOR DEMOLITION AS PER PLAN. NO CHANGE OF EGRESS, USE AND OCCUPANCY.

149-34 35 AVENUE, Queens
40KJun 30

INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS

210-17 113 AVENUE, Queens
68KJun 30

Minor partition work in apts 29a & 29b on with general carpentry and public halls. No change to use bulk or egress

18 GAY STREET, Manhattan
123KJun 30

ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - ALDI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.

535 MORGAN AVENUE, Brooklyn
4KJun 30

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

404 PARK AVENUE SOUTH, Manhattan
Jun 30

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

109 EAST 89 STREET, Manhattan
15KJun 30

INSTALLATION OF TEMPORARY INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.

2-01 50 AVENUE, Queens
Jun 30

INSPECTION & FISP REPAIRS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY

205 EAST 23 STREET, Manhattan
Jun 30

REPLACEMENT EXTERIOR CONCRETE STAIR AN REPAIR LINTEL OVER GARAGE DOOR AS PER PLANS SUBMITTED NO CHANGE OF USE, OGESS OR OCCUPANCY UNDER THIIS APPLICATION

2343 WALLACE AVENUE, Bronx
9KJun 30

SUSPENDED SCAFFOLDING AND ROOF HOIST IN ORDER TO PERFORM FACADE EXTERIOR WORK. FACADE INSPECTIONS TO BE DONE. SIDEWALK SHED TO BE INSTALLED UNDER SEPARATE APPLICATION. NO CHANGE IN USE OCCUPANCY, EGRSS UNDER THIS APPLICATION.

851 TINTON AVENUE, Bronx
Jun 30

MATERIAL HOIST. FOR MATERIALS ONLY. NO WORK FROM HOIST.

224 YORK STREET, Brooklyn
Jun 30

This application is being filed for the mechanical work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy under this application.

129 3 AVENUE, Manhattan
10KJun 30

INSTALLATION OF NEW PLUMBING FIXTURES AND REPLACEMENT 2 GAS RANGES AS PER PLANS

145 HIGHLAND PLACE, Brooklyn
84KJun 30