First time finish out for coffee shop
Approximately 120 lf of 2 poly domestic water line from existing meter to 5 ft outside finished slab and approximately 168 lf of 6 SDR26 sewer with (1) 6 two-way cleanout and (1) 6 single cleanouts from existing cleanout to 5 ft outside finished slab.
PUD UNIT #169. New 2-story Condo SF Residence. 2 bedroom 2.5 bath with attached 2 car garage. Covered front porch and covered side patio.
Emergency Repair to Meter. Replaced meter and mast
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4bath] with Covered Porch Uncovered Wood deck entry and Attached Carport. 800 KINNEY AVE.
ePlan: Residential Expedited Review - New Autofill/Heated pool. 800 KINNEY AVE
Construct new driveway approach of 20 FT and sidewalk of 173 LF and curb & gutter of 45 FT. SP-2025-0157C 2026 061169 000 00 SSI
ePlan: Residential Expedited Review - New Construction of Second dwelling [1bed 1bath]. Existing 1-Story Single Family Res to Remain as is.
Existing unpermitted wood-framed addition on slab-on-grade covered screened deck uncovered composite wood deck two landscape paver paths and one paver pad to be retroactively permitted. All structures extend off the rear of the existing house.
temporary tpole for new construction in Wildhorse
EPLAN - Remodel office and break area - 4th Floor
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Habitable Attic Attached Garage
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office - Phase 6A - 4TH floor Outdoor Trellis. (131364 SF Total)
ePlan: Commercial Expedited Review - [SMART HOUSING] New Construction of Multi Family Buildings - also Contains Leasing Club Fitness Co-Working and Mail. (335504SF).
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [1bed 1bath] with attached Garage. UNIT B
Installation of EV charger.
ETJ Rebuilding power pole. Old pole is falling over. Thank you Travis Bade 5127316088 *** Called out to contractor clarified is a service meter rebuild. Im changing to Upgrade and approving only the meter work. Pole rebuild is not the jurisdiction of our department. ***
Caprock S405 C Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
6700 SF remodel of existing office space that will be remodeled for new technology lab space. The adjacent approximately 21430 SF will be remodeled for office space under permit 2026-075198 PR. This project is in the same existing suite.
Install new RPZ and cap water line.
Total Demo of a SFR 1612 sq ft built 1959. ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
EPLAN - Remodel office labs training and break area - 2nd Floor.
Addition/Remodel to existing SFR to convert existing garage into family room. Addition include new bedroom bathroom and office + new attached garage.
Interior structural repair no change in use height or area. No exterior work.
TEMPORARY BUILDING PERMIT scope of permit is limited to new foundation and in-ground utilities (plumbing only) 5 from slab
gas_test_permit_(r)
new_building_permit_(r)
gas_test_permit_(r)
re-roof_(r)
occupancy_permit_(c)