Search Permits
251,795 results
1-7/f: perform selective demo non-structural wall sections of drywall 7 floors, in hallways & apt units. 1/f -hallway. 2/f - unit# 221,223,224,226, hallway. 3/fl - #321, 323, hallway. 4/f - #421,423,424,426. 5/f - #525, hallwy. 6/f - #621,622,623,624. 7/f -#731,729,728,727,725,723,hallwy. total sf..
interior kitchen remodel. replace existing cabinets and appliances. relocate plumbing and electric to accomodate new layout and appliances.
remodel kitchen w/ all new cabinets,fixtures,finishes,electrical & appliances. kitchen to have the same footprint but with expanded openings to the living room an breakfast room. expand/remodel a bathroom with new electricl, fixtures and finishes.
revision 202606082765- adjustment to permits to add steel beam, footings, adjust framing.
to abate nov 202312184- remove (e) 1 hr guardrail /42 inch tall and 3' wide to comply with (e) easement
to obtain final inspection for work approved under pa#: 202403087430 and 202412106503. all work is complete.
recommencement and completion of work approved uner pa# 202412207227.
replace dry rotted deck pieces at therear deck, approx 10% structural wood are unaffected. this rear deck is located at the rear of the building.
unit #221: master bathroom remodel: like for like, demo shower area, install shower base, upgrade shower walls & plumbing fixtures, install shower door, install new panasonic fan w/light,flooring & toilet. guest bathroom remodel: like for like demo tub area, install tub, upgrade shower walls &
unit #301: two bathroom remodel (1 shower, 1 tub) and 1 kitchen remodel in kind and associated mep. add recessed lights in rooms throughout the house and kitchen.
21nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.
2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm..
interior remodel at kitchen and bathrooms: converting (e) bath and toilet rooms into 2 full baths, kitchen in new location (n) opening at kitchen wall, in kind windows replacements (not street visible) and new bath #3
electrical
mechanical
mechanical
mechanical
plumbing
plumbing
mechanical
mechanical
mechanical
mechanical
plumbing
plumbing
building
plumbing
plumbing
electrical
mechanical