Search Permits
251,795 results
Installation of suspended scaffold for facade repair & inspection.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
REPLACEMENT/REPAIR OF CONCRETE SLAB AND STAIRS COURT YARD. THERE IS NO CHANGE TO THE EXISTING USE, OCCUPANCY CLASSIFICATION, OR EGRESS UNDER THIS APPLICATION.
HEREWITH FILING FOR THE LEGALIZATION OF WORK COMPLETED W/O BENEFIT OF PERMIT TO REPLACE EXIST. EXT. SWING DOOR W/ NEW GAR. DOOR IN EXIST. LOCATION ON EXIST. RES. AND RESOLVE PARTIAL VACATE ORDER (COMPLAINT 5140814). NO OTHER WORK PROP. UNDER THIS APP.
IRA FACADE INSPECTION
MODIFICATION OF AN EXISTING SPRINKLER SYSTEM AT CELLAR, 1ST AND 2ND FLOOR AT ZARA STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
Temporary fence installation in conjunction with the NB application X01380803-I1
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
MECHANICAL SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER M00785688-I1.
Install of temp tents, platforms, trusses, production equip, no alt to exist structures for ZEDD in the Park. A TPA is required. Prod is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event complete.
MECHANCIAL WORK IN CONJUNCTION WITH RENOVATION & BUILDING ENLARGEMENT FOR 1 FAMILY RESIDENCE. INSTALL SPLIT HVAC SYSTEM FOR HEATING & COOLING, MAKEUP AIR, TOILET, KITCHEN AND LAUNDRY EXHAUST, RELATED DUCTS AND DIFFUSERS. INSTALL FIREPLACE FLUE.
INTERIOR RENOVATION OF EXISTING 3-STORY BUILDING WITH CELLARAS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
MODIFICATION OF PLUMBING FIXTURES & SPRINKLER SYSTEM IN CONJUNCTION WITH RENOVATION OF EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALL GAS AND PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
PLUMBING WORK ON BAS, 1ST & 2ND FLOOR. NO CHANGE IN USE GROUP, EGRESS AND OCCUPANCY. (TOTAL: EXISTING TWO FAMILY DWELLING UNITS UNDER CO# 243459/1994)
Legalization of 10X12 deck.
APPLICATION BEING FILED FOR FACADE REPAIRS INCLUDING:BRICK MASONRY REPLACEMENT/RE-STITCHING; WINDOW (CONC) SILL PATCHING; STUCCO REPLACEMENT; CMU WALL PATCHING; CLAY COPING REPLACEMENT; CAST CONCRETE PATCHING, ETC. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
HEREBY FILING DEMO/REMOVAL OF EXISTING COMMERCIAL TENANT SPACE (NON-LOAD BEARING PARTITIONS, CEILINGS, NON-ESSENTIAL SERVICES) ON 1ST FLOOR AND PARTIAL CELLAR AS PER PLANS
MODIFICATION OF PLUMBING FIXTURES & SPRINKLER SYSTEM IN CONJUNCTION WITH RENOVATION OF EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PROPOSE A CONVERSION FROM A PORTION OF RETAIL SPACE TO A DENTAL OFFICE AS PER THE PLANS FILED HEREWITH. THE OTHER PORTION OF EXISTING RETAIL SPACE REMAIN THE SAME, AND IT'S NOT PART OF THE SCOPE OF WORK. OBTAIN A NEW C OF O.
Renovation including interior and exterior work, remove and install non load bearing partitions, replace stair, remove radiators and replace with radiant fl, create opening for new window, as per plans filed herewith. No change to use, egress or occupancy
General construction as per plans filed herewith. No change to use, bulk, egress, or occupancy.
COMBINING TWO EXISTING BUILDINGS TO CREATE A SINGLE FAMILY HOME AS PER THE DRAWINGS FILED HEREIN.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
NEW DOOR AND EXTERIOR STAIR AT REAR BUILDING INVOLVED IN GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. REPLACE 3-CONDENSERS FOR AC UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Mechanical work on part of the cellar and 1st floor.
General Construction for interior renovation of Apartment 11C on the 12th floor as shown on drawings filed herewith. No change in use, egress, or occupancy.