Search Permits
251,795 results
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
TEMPORARY ROOF/ OVERHEAD PROTECTION AT THE ADJOINING PROPERTY AS PER DRAWINGS. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION AND USE OF TEMPORARY OVERHEAD, ROOF AND MECHANICAL PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OCCUPANCY UNDER THIS APPLICATION.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
TEMPORARY CONSTRUCTION FENCE
THE PLANS ENCLOSED DEPICT THE MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH THE PROPOSED PARTIAL DEMOLITION.
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
PROPOSED PLUMBING WORK AS PER PLANS FROM CELLAR TO 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
1 NEW YORK PLAZA - REMOVAL OF INTERIOR PARTTIONS, FLOOR, CEILING FINISHES & RELATED EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 18TH FLOOR ALLY BRIDGE OFFICE AS PER PLANS SUBMITTED HEREWITH.
8' HIGH SOLID FENCE AROUND PROPERTY PERIMETER.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Exterior storm piping
PROPOSED PLUMBING WORK AT CELLAR, 1ST AND 2ND FLOOR. WORK AS PER PLAN. NO CHANGE TO USE, EGRESS, OROCCUPANCY. NO CHANGE TO BUILDING ENVELOPE OR FLOOR AREA.
Filing to register gas fired boiler with burner in cellar as per plans filed herewith.
1 NEW YORK PLAZA - INTERIOR DEMO OF MECHANICAL DUCTWORK AND MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Interior office renovation as per plans filed herewith. No change in use, egress, or occupancy.
FISP INSPECTION VIA INDUSTRIAL ROPE ACCESS
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
INSTALLATION OF PLUMBING FIXTURES FOR A NEW TWO-FAMILY DWELLING.
Modification to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Installation of 1x new grease trap for 1x new 3-compartment sink in the existing kitchen. Relocation of an existing sink and removal of 1x stove.
PROPOSED TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH ALT#Q01417071-I1.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.