Search Permits
247,466 results
TEMPORARY ELECTRICAL PERMIT - Electrical underground work associated with the foundations for the Factory building for Project Toaster.
Construct new driveway approach of 18 FT. No sidewalk inspection per plan review.
Construct new driveway approach of 25 FT and sidewalk of 334 LF and curb & gutter of 319 FT. SP-2024-0050C 2026 012310 000 00 SSI
EXPRESS: Handicap Ramp
Express- Foundation repair. Install 20 exterior and 4 interior pilings
Install (1) Tesla wall connector from the panel through the attic/ surface mounted and back down into the garage location.
New Construction- New SFR 4 bed 3 bath 2 story
New pool/spa - no proposed decking
Build temporary loop. 100 A.
New irrigation system
Routing new gas line to fixture 40
New construction sfr in the etj 2366 sqft
ePlan: Residential Expedited Review - Autofill/Heated Pool. Bldg 1
Bldg 2 Detached Carport and 1-Story Unit Above Carport [2bed 2bath]
Installation of a 24 stall private fleet charging station and associated electrical equipment.
Express: Exploratory non structural demo
New inground pool
Need a 30 foot tunnel to be dug on the right side of the house to replace yard line from home to city connection.
tpole ref 2026-122684 BP
Replacement of complete existing central heat and air system with or without duct work
Electrical pole is broken we will replace pole 200 amp meter and disconnect
Remove and replace shingles on existing roof shingle replacement only.
ePlan: Residential Expedited Review - FOUR UNITS: New Construction of 4 MODULAR 3-Story Single Family Res; 2100 Wilson St: New 3-story SF Res [3bed 2.5bath] with attached garage and roof deck
New 1 story SFR with 4 beds 4.5 baths 2 car garage front covered porch and rear covered patio
Moving - Plan on installing a pool and overhead lines would be over pool now. upgrading service to a 200amp.
Addition/Remodel - Retro permit for removing exterior landing/steps planters interior remodel to convert existing unfinished basement to a game room. New doors and windows new interior staircase (deferred structural plans)
Total demo of detached single-story garage 621 sq ft circa 1971 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
ETJ- New Construction of SFR
Express: Fire repair damage
ePlan: Residential Expedited Review - Three Unit Unit1A New construction of 3-Story Single Family Res [5bed 4.5bath]