Search Permits
247,466 results
108 tunnel below the foundation to replace the entire drain system. 3 access holes - right front left
New vehicular gate and fence for an existing multifamily.
change out sewer line from the house to the tap due to a collapse of the existing sewer line and also the water yard line will be change due to a brakeage on the water pipe
New 2-story single family residence 6 bed/3.5 bath attached garage covered porch and covered patio
Express - Reroof: tear off and replace existing shingle roof 50 squares with Malarkey Vista Class 4 impact-resistant shingles. Replace damaged roof decking as needed not to exceed 128 sq ft. No structural changes.
Landing Repair At Rear Of Building 8559. Like For Like Replacement Of Aged Materials
Total demo of SFR 3334 SqFt circa 1970
Express: Foundation repair
ePlan: BAUS Review - Interior Remodel on Apron Level for Southwest Airlines (3900 SF).
Interior alteration of approx. 4100 SF of existing interior space.
Replace 1 RPZ backflow preventer next to booster pump in detail shop bay #1.
Interior Remodel- modernize layout converting family room to bedroom add new bathroom and reconfigure existing laundry area.
Addition to existing 1-story single family residence. Adding common area and one full bathroom with washer and dryer. 2 bed/2 bath
Landing Repair At Building 8505 By Unit 1010. Like For Like Replacement Of Aged Materials
Cap off water and waste water
Austin 2 Mile ETJ. Austin Energy. Homebuilder Loop
Interior remodel of SFR
Replacing 2 of the 3 existing 8 wide x 7 tall overhead garage doors with one larger 17 wide x 7 tall overhead garage door. Which will require demolition of one of the dividing wall / columns and installing a larger header / LVL beam.
100/125 amp panel mater base 200 amp grounding and bonding
Install new 13.5kw energy storage system & replacement of 1 energy storage system with second 13.5kW ess for existing residential only.
Interior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall
Interior Remodel and Garage Conversion- remove walls to open floorplan. Replace flooring and interior design. Enclose part of garage for laundry. Replace windows and doors.
Replacing water yard line up to 20.
Total demo of 1253 SqFt SFR circa 1940
Replacing and upgrading main electrical panel to 200amps replacing overhead service riser and meter can.
100amp weatherhead and service entrance conductor replacement ground rods and interested bridge install.
Interior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall
First time tenant fit out for a restaurant.
Installation of new load center and HVL switches for existing Manufacturing facility
Express: Fire damage rebuild back to floor plans