INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.

1056 42 STREET, Brooklyn
Aug 5

INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

2323 NEWKIRK AVENUE, Brooklyn
10KAug 5

installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

706 SACKETT STREET, Brooklyn
4KAug 5

INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.

251 EAST 121 STREET, Manhattan
Aug 5

Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

34 WALKER STREET, Manhattan
5KAug 5

Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

336 EAST 86 STREET, Manhattan
3KAug 5

Multipoint Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.

1387 UNIVERSITY AVENUE, Bronx
Aug 5

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

51-33 GOLDSMITH STREET, Queens
1KAug 5

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

176-21 WEXFORD TERRACE, Queens
5KAug 5

HEAVY DUTY SIDEWALK SHED FOR FACADE INSPECTIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE

820 OCEAN PARKWAY, Brooklyn
13KAug 5

INSTALLATION OF PIPE SCAFFOLD AT 221 EAST 82 STREET MANHATTAN NY 10028 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

221 EAST 82 STREET, Manhattan
8KAug 5

INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

31-08 STEINWAY STREET, Queens
0KAug 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

51-33 GOLDSMITH STREET, Queens
1KAug 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

333 RECTOR PLACE, Manhattan
1KAug 5

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

2735 CRESTON AVENUE, Bronx
1KAug 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

234 EAST 204 STREET, Bronx
1KAug 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

141 EAST 44 STREET, Manhattan
5KAug 5

installation of construction fence to protect site, during Emergency Declaration work issued by HPD & DOB.

64 BROOK STREET, Staten Island
5KAug 5

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

193 GRAFTON STREET, Brooklyn
Aug 5

INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF THE RESIDENCE

60A NEWTON STREET, Staten Island
Aug 5

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER DRAWINGS, ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

190 3 AVENUE, Manhattan
3KAug 5

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

181 CLERMONT AVENUE, Brooklyn
6KAug 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

1605 UNIVERSITY AVENUE, Bronx
1KAug 5

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

83-44 PARSONS BOULEVARD, Queens
1KAug 5

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

125 MERCER STREET, Manhattan
0KAug 5

INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. NO CHANGES IN THE EGRESS.

200 CHAMBERS STREET, Manhattan
Aug 5

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

161 FT WASHINGTON AVENUE, Manhattan
1KAug 5

Installation of suspended scaffold for facade work or inspection.

349 EAST 49 STREET, Manhattan
Aug 5

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

176-21 WEXFORD TERRACE, Queens
5KAug 5

INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

18 WEST 71 STREET, Manhattan
9KAug 5