Search Permits
251,201 results
23rd fl - to program 2 way comm intercom stations for passenger and freight elevator lobbies limited to the 23rd floor. intercom is being installed to provide communication abilites during time the elvator lobby doors are locked or stairwells blocked. conduit, back boxes, calling and installation to
1st installation of (3) pre manufactured accessible meeting pods. the pods shall be seismically anchored. electrical, fire alarm and fire sprinklers shall be designed and installed by contractors under deferred design-build scope
revision to 202605111055. interior tenant improvement revised layout with reduced scope. scope includes demo of non structural partitions, new partitons, finishes, relocation of light fixtures. mep, fire and life safety under sep permit.
b lvl & 1 lvl: new base building room, restaurant spaces and circulation spaces constructed. lvl 2,3 & n/s 4: new b occ. office spaces provided. s/s lvl 4 and lvl 5: new residential units to be provided. (e) ter lvl 5 renovated and doors to ter replaced with sliding door system with egress door.
project consists of modification of two (e) door swings, relocation of exterior door and installation of exterior steel stair. new millwork to be added in exterior courtyard mep will be deffered and provided by gc.
replace and install wood sectional garage door and electrical opener in a existing garage. no change in existing garage opening
revision 202601304901-suite 205- replace (e) window frame and glazing with mechanical louver
to obtain final inspection for work approved under pa# 202407015590. all work is complete.
to obtain final inspection for work approved under pa# 201907105502. all work is complete.
to obtain final inspection for work approved under pa# 202407015606. all work is complete.
plumbing
plumbing
electrical
building
short_term_rental
electrical
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Installation of Solar PV system on existing rooftop with no changes to egress, use or occupancy
Suspended Scaffolding For Facade Restoration/Repair as shown on plans
INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLD FOR INSULATING AN EXTERIOR PIPE AT REAR OF BUILDING. AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. AREA WILL BE CLOSED OFF FROM THE PUBLIC.
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AND SUPPORTED SCAFFOLD AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AND SUPPORTED SCAFFOLD AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Suspended scaffold outrigger installation for Facade repair works
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc