Search Permits
179,842 results
Interior renovation of five units in a multi-family buildings. Construct fire rated partitions between units. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. [7 Day Review - Multi-Apps. (5)]
Shade Structure Canopy C with lighting; Site Plan reference SP-2025-0254C (Building C)
Interior Non-Structural Demolition
Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing HVAC units like-for-like in the same locations. No duct line or condensate rerouting. (5) Applications
Replacing HVAC system with new upgraded version. Involves new exterior pad new wall penetrations for larger ducts new ceiling tiles in specific areas and new air registers.
TEMPORARY BUILDING PERMIT: The scope of this permit is limited to excavation foundation work below-grade columns and the structural slab. 2026-045276 PR
Express: Tub to shower conversion
Build new service
7 DAY - INTERIOR REMODEL OF OFFICE SPACE. MOSTLY ELECTRICAL AND MECHANICAL AT EXISTING OFFICE SPACE - OVA
Moving toilet drains to meet ADA standards. We are breaking the foundation and 4ftx4ft square and we will be moving the drains just slightly to meet ada requirements. Toilet flanges need to be moved approx. 2 further away from the wall to meet that requirement.
2458AL NEW 2 STORY 3 BEDROOM 2 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH
Irrigation system
*Green Building* New 2-story 4 bedroom 3 bathroom single family residence with attached garage covered front porch and rear covered patio.
Finish out of existing tenant space 108. Change of use approved. No access control. Suite 108 and suite 101B will be occupied by the same business/tenant. (Suite 108)
Home builders loop Ref: 2026-073232 BP
Total demo of SFR 3206 sq ft circa 1946. ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New.
Replacement of complete existing central heat and air system with or without duct work 1 system: 5 Ton 14 Seer2 Single Stage Condenser evaporator coil and gas furnace
Building 2 New 3 Story Single Family House with attached carport
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [1bed 1bath]. Bldg 2
Express: Tub to shower conversion (walk in shower); replace valve with new shower valve
Interior Non Structural Demolition
Shade Structure Canopy C with lighting; Site Plan reference SP-2025-0254C (Building C)
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1315
Replacement of complete existing central heat and air system with or without duct work Replacement of Hvac system.
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office Space (22320 SF)
New Construction Plumbing ETJ 2698 sq. ft.
Excavate from outside of home under foundation to replace approximately 37ft of main sewer and kitchen drain line.
704 E 46th St: New pool for front building in 3-unit use. W/ plumbing permit
installation new 125A service sub panel and 100A AC disconnect