Search Permits
179,842 results
Irrigation system
Express; Metal roof replacement
QT - small interior remodel - selective demolition construction of new partitions ceilings mechanical electrical and plumbing as indicated on drawings at existing office space - OVA
Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three access holds: one in front one on the side and one behind the house.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton vertical gas system
Internally illuminated cabinet
New two-story SFR (4br/3ba) with attached garage covered patio and covered porch *PRODUCTION BUILDER- GREEN BUILDING*
Repair of water damage following a fire extinguished on the upper floor of an existing multi-family apartment building. This project scope includes replacement of damaged elements: the buildings use occupancy area height and number of dwelling units will not be modified.
Replacement of complete existing central heat and air system with or without duct work AH AND COND CHANGE OUT
New Construction 2 Story SFR with attached garage and covered porch and patio- 4bed 3.5bath.
New two-story SFR *PRODUCTION BUILDER- SMART HOUSING / GREEN BUILDING*
ePlan: Residential Expedited Review - New Autofill/Heated pool w/Spa
ePlan: Residential Expedited Review - New Autofill/Heated Pool. BLDG 2
Interior Renovation to (5) Units construct Fire Rated Partitions between Units Covert Existing Tubs to Showers replace Existing Counter Tops cabinets fixtures and equipment with new. - Replace existing HVAC units like-for-like in the same locations. No duct line or condensate rerouting. (5) Applications
New 2 story SFR attached garage covered porch and patio 4/3
*Partial Demo* Porch enclosure
New 1 Story detached Carport
7 DAY - FINISH OUT OF ADMIN OFFICE - OVA
Replace 2 exterior outlets
garage conversion to extend living room and create bedroom. Active permit for fire damage but scope changed with modifications to current floor plan reconfiguring garage framing to convert area into habitable sqft was considered bedroom 4 and was converted prior to house fire
Interior renovation of five units in a multi-family buildings. Construct fire rated partitions between units. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. [7 Day Review - Multi-Apps. (5)]
Interior Non-Structural Demolition
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New.
New 2-story 2 bedroom 1.5 bathroom dwelling unit with attached garage and covered front porch.
Replacement of complete existing central heat and air system with or without duct work
New pool and bubbler/spa
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Garage. BLDG 1
New Construction of a 2-Story Duplex [6bed 5bath] each with attached 1-car Garage and 1-car Carport
CHANGE OF USE TO MEDICAL OFFICE Interior tenant finish-out for acupuncture clinic. Includes non-load-bearing partitions for treatment rooms and officeone hand washing sink electrical updates and flooring. Non-structural interior remodel no exterior work.
Total demo of sfr 1044 sqft circa 1935