PermitDig

Search Permits

249,120 results

Construct two-story, 16,646 (11) unit apartment facility with garages. Group R-2 occupancy. Type V-A construction. Special inspection required for reinforced steel, concrete, masonry, anchoring, epoxy. (11) 1-ph metered 200A electrical panels. Building area divided with firewall. DEFERRED FIRE SPRINKLERS. DEFERRED FIRE ALARM. Related to civil permit PMT24-05928.

630 N POWER RD, Mesa
Sep 14

Civil improvement for 38 apartment units. One new 1-inch landscape water meter. Four new 2-inch domestic water meters to be installed with the buildings under separate permit PMT24-06103. 4-inch fire lines.

Unknown, Mesa
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Unit 302 Install disconnects for a replaced heat pump and air handler with heater package

13128 WONDERLAND WAY, Germantown
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel and wired touchpad.

11776 PARKLAWN DR, Rockville
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.we are doing a heavy up to 200 amps services and panel

534 WHETSTONE GLEN ST, Gaithersburg
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 11.7 KW solar system (26 x 450 watt panels) and 2 x 16 KW Backup Batteries

13219 REDSPIRE DR, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 200A Backup Gateway for Energy Storage System, Service Conductor Refeed

11407 HONEYBEAR LN, Germantown
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, and wired touchpad.

18023 YELLOW ACRE DR, Boyds
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.1-200amps. panel, & 1-SEC.

8101 RAYBURN RD, Bethesda
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance. 2 smoke detectors installation Unit number #320

10827 HAMPTON MILL TER, Rockville
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF: # (6) APPLIANCES, # (20) LIGHTS, # (6) CIRCUITS, # (6) SWITCHES, # (18) OUTLETS AND # (1) SMOKE DETECTOR

16617 RAVEN ROCK DR, Gaithersburg
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Replacement of service entrance cable ripped off home and damaged by falling tree. Existing service is 200 amps. Replacing point of attachment with a through bolt and galvanized POA loop.

1708 CODY DR, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Install one 60A dedicated circuit for a Tesla Wall Connector EV charging station at existing single-family dwelling.

1619 SPOTTSWORTH WAY, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.45 roof mounted solar panels

7213 DEER LAKE LN, Rockville
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.30 roof mounted solar panels

321 QUAILHILL DR, Brookeville
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF: # (1) ELECTRIC STOVE, # (1) GARBAGE DISPOSAL AND # (1) GFI

5116 NORBECK RD, Rockville
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF: # (1) 200 AMPS HEAVY UP, # (1) SERVICE ENTRY CABLE, # (35) CIRCUITS, # (22) LIGHTS, # (20) SWITCHES, # (15) OUTLETS, # (7) APPLIANCES, # (8) SMOKE DETECTORS AND # (1) MOTOR.

9114 JONES MILL RD, Chevy Chase
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Install circuit to power air handler / auxiliary heat and Install 240V / 30A circuit to power heat pump water heater

9127 FRIARS RD, Bethesda
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.14 roof mounted solar panels

2305 SOLMAR DR, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.WIRING OF 200AMP TEMP ON POLE SERVICE

9438 RIVER RD, Potomac
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Interior alterations on 3rd floor office building, electrical power distribution, lighting, low voltage.

12125 VEIRS MILL RD, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Rewire garage due to storm/tree damage.

18 BARN RIDGE CT, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Install 50A circuit to power range

6905 WOODLAND AVE, Takoma Park
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Habitat for Humanity house remodel, panel and SEU replacement, all drywall removed, new bath plug circuits, oven, dryer, x8 smoke detectors and new smoke circuit. x8 new circuits.

7840 MINERAL SPRINGS DR, Gaithersburg
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Main Panel Upgrade 200A

12116 ARBIE RD, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.200 Amp Pepco Overhead Service Upgrade

1005 GABEL ST, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF 28 MODULES - ROOF MOUNTED - 11.480 kW DC, 10.640 kW AC w/ MPU

12116 ARBIE RD, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.Install 7.360 KW Roof mounted solar PV ARRAY + 30.000 kWh Energy Storage

8009 PARK CREST DR, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE DAMAGED 200A LINE SIDE SERVICE TAIL WITH NEW 200A LINE SIDE SERVICE TAIL.

1015 TRACY DR, Silver Spring
Sep 14

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (32) ROOF MOUNTED SOLAR PANELS, (32) MICRO INVERTERS, ONE 70A FUSED LINE SIDE TAP, 13.760 KW

1015 TRACY DR, Silver Spring
Sep 14