Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.Bathroom remodeling , 400amps heavy up and 100amps subpanel
Please do not request inspections under this permit until 2 business days after permit issuance.Addition rough wiring for receptacles , lights fixtures and 2 appliance
Please do not request inspections under this permit until 2 business days after permit issuance.Remodeling new lights futures and rough wiring and 400 amps heavy up
Permit Revised by DPS; new disco & load side SEC w/ updated grounding (NOT H/U)
Please do not request inspections under this permit until 2 business days after permit issuance.200amp heavy up
Please do not request inspections under this permit until 2 business days after permit issuance.installing on deck: 1 ceiling fan 1-light 2-outlets 2-switches
Please do not request inspections under this permit until 2 business days after permit issuance.28 devices (13 switches, 15 outlets) 8 light fixtures, 6 circuits total (2 20amp, 2 15amp, 1 30 (dryer), 1 50amp (range)
Please do not request inspections under this permit until 2 business days after permit issuance. Load In: 9/19/26 Load Out: 9/19/26 (1) 20kw Generator
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF: (28) LIGHTS, (10) OUTLETS, (12) SWITCHES, (8) APPLIANCES REPLACEMENT OF 200 AMPS SUBPANEL
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.STALL 200 AMP TO PANEL
Please do not request inspections under this permit until 2 business days after permit issuance.Install disconnects for 2 replaced heat pumps and 2 air handlers with heater packages.
Please do not request inspections under this permit until 2 business days after permit issuance.Adding 1 occupancy Sensor
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical install for a bathroom remodel.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (20) ROOF MOUNTED SOLAR PANELS, (1) INVERTER, 8.800 KW INSTALL (1) INTEGRATED BATTERY, 13.5 KWH, ONE BACK-UP GATEWAY INSTALLED BETWEEN 200 A SERVICE DISCONNECT AND MSP.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (65) ROOF MOUNTED SOLAR PANELS, (65) MICRO INVERTERS, ONE 150A LINE SIDE TAP, 28.600 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Install circuit to power air handler / auxiliary heat, including breaker, wire, and disconnect
Please do not request inspections under this permit until 2 business days after permit issuance.Installation add-on or one hardwired outdoor camera.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a new, roof mounted solar photovoltaic electrical panels.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (ONE) BACK-UP BATTERY SYSTEM, 15 KWH (TO EXISTING SOLAR) ONE BACK-UP GATEWAY INSTALLED BETWEEN METER AND MSP.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (ONE) BACK-UP BATTERY, 13.5 KWH (TO EXISTING SOLAR) ONE BACK-UP GATEWAY INSTALLED BETWEEN METER AND MSP.
Please do not request inspections under this permit until 2 business days after permit issuance.Install circuits for a new 1st time ductless split heat pump system with 1 outdoor unit and 1 indoor unit. Install GFCI receptacle.
Please do not request inspections under this permit until 2 business days after permit issuance.House remodel including all rough-in and final electrical installations
Please do not request inspections under this permit until 2 business days after permit issuance.2 circuits, 8 lights, 2 exhaust fans, 2 outlets, replacing 200 amps panel
Please do not request inspections under this permit until 2 business days after permit issuance.Replace disconnect for ductless split heat pump system with 1 outdoor unit and 1 indoor unit. This is a replacement of existing mini split
Please do not request inspections under this permit until 2 business days after permit issuance.Replacing the existing 200 amp Electrical Panel with a new 200 amp MaIn Breaker Panel and upgrade the grounding electrode system.
Please do not request inspections under this permit until 2 business days after permit issuance.200 amp temp pole service
TEMP-POWER is only for Restoring power for landscaping, pool and restoration repairs. Ok to release electric. Contractor responsible for lock out tag out and any damages resulting from the power being turned on. Failure to obtain a full permit in 30 days may result in the removal of power.
Construction activities are not restricted in general, but outside noise attributed to construction is limited to the following hours: Regular Hours (October 16 – April 30) · Monday–Friday: 6:00 a.m. to 8:00 p.m. (5:00 a.m. for concrete pouring) Summer Hours (May 1 – October 15) · Monday–Friday: 5:00 a.m. to 7:00 p.m. (4:00 a.m. for concrete pouring) · Saturday: 7:00 a.m. to 7:00 p.m. To request after-hours approval, please provide the following information: • Project location 311 W Main •
Install one LED illuminated pan channel letters to front fascia of suite "EXCEL MENS WEAR" 29 sq. ft.