Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.Reinstall existing (59) panel roof mounted 15.34 KW PV solar in kind. No structural changes to occur.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL OF ROOF MOUNTED SOLAR PANELS (11.04KW); 24 REC460AA PURE-RX 460W PANELS
Please do not request inspections under this permit until 2 business days after permit issuance.ERECTED TEMPORARY POWER POLE FOR PEPCO TO RELOCATE THE SERVICE DROP SO THAT THE BRICK ON THE CHIMNEY CAN BE REPOINTED
Please do not request inspections under this permit until 2 business days after permit issuance.Installing a 10kw generator with a 100amp select circuit ATS.
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/INSTALL 42 ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 18.48KW
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary Service
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary Service
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ INSTALL 19 ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 8.36KW
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary Service
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of two 10 ton AC Gas rooftop packaged units
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 28kW generator with 200 amp transfer switch
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary Service
Revision - There is a second electrical sign being installed at this location.Please do not request inspections under this permit until 2 business days after permit issuance.Wire channel letter sign and push through sign to existing circuit
Please do not request inspections under this permit until 2 business days after permit issuance.240v Dedicated Circuit for EV Charger
Please do not request inspections under this permit until 2 business days after permit issuance.Will be adding a Exterior service disconnect next to meter.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation add on of two touchscreen touchpads.
Please do not request inspections under this permit until 2 business days after permit issuance.200 Amps Main Electrical Panel Replacement
Please do not request inspections under this permit until 2 business days after permit issuance.Replace 200 amps panel, install 12 lights, 30 switches/outlets 6 circuits and mini split system
Please do not request inspections under this permit until 2 business days after permit issuance.Typical temp pole service for construction
Please do not request inspections under this permit until 2 business days after permit issuance.Pole Service
Please do not request inspections under this permit until 2 business days after permit issuance.To roughing 10 outlets
Please do not request inspections under this permit until 2 business days after permit issuance.Additional work per owner's request
Please do not request inspections under this permit until 2 business days after permit issuance.Level 2 EV charger installation inside the garage.
Please do not request inspections under this permit until 2 business days after permit issuance.Panel Replacement at Apartment #608
Please do not request inspections under this permit until 2 business days after permit issuance.Total 100kw: (1) 100kw Address: 18031 Central Park Circle Boyds, MD 20841 -Install 11/6, Remove 11/8
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ REPLACE EXISTING MAIN SERVICE PANEL AND SEU CABLE. 200AMP SERVICE
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ REPLACE EXISTING MSP. 200AMP SERVICE
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.installation of a 25.83kw Roof Mounted solar system with 63 panels at 410 watts each and 2 inverter
Please do not request inspections under this permit until 2 business days after permit issuance.