Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.low voltage for fire alarm - assocaited with 1172960
Please do not request inspections under this permit until 2 business days after permit issuance.Install light fixtures, light switches and receptacles for an addition to the church.
Please do not request inspections under this permit until 2 business days after permit issuance.Rough in and install new recessed lighting and ceiling fan for screened in porch
Please do not request inspections under this permit until 2 business days after permit issuance. Add 60amp breaker and installing EV Charger on front right wall of garage.
Please do not request inspections under this permit until 2 business days after permit issuance.Run 12 gauge wire approximately 35-40 ft to opposite wall and install quad receptacle w/ surface mounted enclosure and RS cover. Install Square D QO 20amp breaker.
Please do not request inspections under this permit until 2 business days after permit issuance.From electrical panel run 6/2 MC approximately 5-10ft. At charger location mount an EVSE and hard wire the electrical connections. Install Square D QO 60amp breaker.
Please do not request inspections under this permit until 2 business days after permit issuance.Low Voltage cabling for Data and Wireless Access Points for the area.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (1) BACK-UP BATTERY, 15 KWH TO EXISTING SOLAR (16.470 KW)
Please do not request inspections under this permit until 2 business days after permit issuance.ONE GATEWAY INSTALLED BETWEEN METER AND MSP. (200A SERVICE)
Please do not request inspections under this permit until 2 business days after permit issuance.(1) dedicated circuit for a 5 TON 60A 240V Air Handler (1) dedicated circuit for a 2 TON 30A 240V A/C condenser
Please do not request inspections under this permit until 2 business days after permit issuance.Install energy storage system
Please do not request inspections under this permit until 2 business days after permit issuance.Wiring of remodel on first floor- new bathroom(s), bedroom, office
Please do not request inspections under this permit until 2 business days after permit issuance.NEW ELECTRIC STOVE
Please do not request inspections under this permit until 2 business days after permit issuance.This EP is for installing (5) Plugs and (4) Lights in Basement Left back corner of the house , because the room caught on fire, Pepco came and took meter out, and we need pepco to re-install the meter
Please do not request inspections under this permit until 2 business days after permit issuance.Installing wiring for renovated bathroom and bathroom
Please do not request inspections under this permit until 2 business days after permit issuance.EVSE installation 60 amp front left of garage
Please do not request inspections under this permit until 2 business days after permit issuance.* Install One 20 Amp Floor Heat * Three Receptacles * Install 20Amp Wall Split AC * Install Five Recessed Lights
Please do not request inspections under this permit until 2 business days after permit issuance.EVSE installation 60 amp in the garage
Please do not request inspections under this permit until 2 business days after permit issuance.New 240 volt ckt for new EVSE
Please do not request inspections under this permit until 2 business days after permit issuance.EVSE installation 60 amp next to the panel
Please do not request inspections under this permit until 2 business days after permit issuance.Contractor, Replace existing 200 amp panel.
Please do not request inspections under this permit until 2 business days after permit issuance.Install Rivian Wall Charger on a new 60A circuit using #6 AWG conductors from existing 100A garage subpanel.
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR AN EMPORIA PRO WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. THE ACT OF SELF DISCONNECTING UTILITY WIRES OR METERS IS PROHIBITED AND MAY CAUSE DAMAGE OR INJURIES. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility (either SRP at 602
CONSTRUCT A 591 SF SWIMMING POOL. NO SPA. INSTALLATION OF 250 LB PROPANE TANK SURFACE MOUNTED TO WALL. 3-FT OF .75-IN GALVANIZED GASLINE BURIED 18-IN WITH 14 GAUGE TRACER WIRE FROM TANK TO 400K BTU POOL HEATER. GASLINE TO BE INSTALLED PER 2024 IFGC & FPD 6104.1. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED
CONSTRUCT A 64 SF SPA WITH EXISTING SWIMMING POOL AND EQUIPMENT UNDER HOST NO. 181653. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE
PLUMBING PERMIT TO REPLACE TUB TO SHOWER. REPLACING PAN, DRAIN, AND VALVES. USING GLASS DOOR. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
CONSTRUCT A 457 SF SWIMMING POOL. NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY #30895, EXPIRES 12/31/26. REF MST19-00383. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
30x30 900 sq. ft. Detached Shop/Barn with Attic Storage. Also, electrical service panel to be upgraded to 400A as part of project.
Please do not request inspections under this permit until 2 business days after permit issuance.Replacing the existing electrical service with a 200 amp upgrade electrical service.