Search Permits
248,074 results
An addition of two bedrooms and one full bathroom
New 2309 SF single story residence with a 2+ car garage at Hawes Crossing. Includes water, electric and gas meter. Special inspections for post tension slabs - SEE ADDENDA MST25-07605 - Ref: MST26-08011 for 2024 code update.
NEW 1970 SF SINGLE STORY RESIDENCE WITH 2+ CAR GARAGE IN HAWES CROSSING. INCLUDES NEW WATER, GAS AND ELECTRIC METER. SPECIAL INSPECTIONS FOR POST TENSION SLABS. ADDENDA MST22-18751 - PARCEL ADDITION, SHEET S1.01 ADDED PARCEL H INFORMATION: · REVISED GEOTECHNICAL REPORT DATES: SHEETS S1.07 -S1.12 - ADDED SHEETS FOR 9 1/2" FOUNDATION FOR PARCEL F. Ref: MST26-07852 for 2024 code update.
Install (1) 37.1 sq ft exterior LED illuminated wall sign INDUSTRIAL SHOEWORKS EST 1956.
PROJECT IS TO RELOCATE THE EXISTING FIRST-FLOOR IDF ROOMS AT BANNER BAYWOOD MEDICAL CENTER TOWER 2. IDF ROOMS 0104 AND 0105 WILL BE COMBINED INTO A SINGLE APPROXIMATELY 180 SF IDF ROOM AND RELOCATED TO ROOMS 100363, 100363A, AND A PORTION OF ROOMS OC1-002 AND 100362. IDF ROOM 0107, LOCATED IN THE CENTRAL PLANT/FACILITY SERVICES AREA, WILL BE RELOCATED TO ROOM 100233. THE PROJECT WILL CONSIST OF FINISHES REFRESH.
NEW 2961 SF TWO STORY RESIDENCE WITH A 2+ CAR GARAGE AT HAWES CROSSING. INCLUDES WATER, ELECTRIC AND GAS METERS. SPECIAL INSPECTION FOR POST TENSION SLABS. SEE MST23-15248 FOR PARCEL A, B, D AND E OF HAWES CROSSING. ADDENDA MST25-01487 ADD PARCEL H & F, REVISE PARCEL A, D, B AND E INFORMATION. Ref: MST26-07849 for 2024 code update.
AFP26-01281 - Existing inpatient rehab unit on the third floor of Banner Baywood, Building 1. Converting an existing staff breakroom into a materials management and storage room. Also converting an existing therapy gym into a non-compounding pharmacy. No change to patient areas, egress, or increase of plumbing fixtures.
INSTALL 24 PRIVATE FLEET EV CHARGING STALLS SUPPORTED BY (1) PAD MOUNTED UTILITY TRANSFORMER: (1) 4000A, 277/480V MCB SWITCHBOARD: (3) TESLA PRE-ASSEMBLED SUPERCHARGER UNITS, EACH WITH (1) V4 SUPERCHARGER CABINET & (8) V4 SUPERCHARGER POSTS
INSTALL 16 EV CHARGING STATIONS FOR PRIVATE USE SUPPORTED BY (1) PAD MOUNTED UTILITY TRANSFORMER: (1) 2500A, 277/480V MCB SWITCHBOARD: (2) TESLA PRE-ASSEMBLED SUPERCHARGER UNIT WITH (1) V4 SUPERCHARGER CABINET & (8) V4 SUPERCHARGER POSTS: (4) LIGHT POLES: (4) WASTE MANAGEMENT BINs
Installation of one commercial roll-up door at an interior opening within the existing building. Work includes mounting the door assembly, guides, brackets, and associated hardware in accordance with manufacturer requirements. No exterior building modifications are included in the scope of work, and the wall is not a fire wall or load barring and there's no electrical going to the door.
Master Project description: Widening Ellsworth Road from Serenity Rd to Germann Rd to three lanes in each direction including a mill and overlay of the existing roadway, adding median, storm drain extensions, landscaping, irrigation, signing, striping, traffic signal improvements and street lighting improvements. Description of work to be done under this permit: Install landscape irrigation meter and appurtenances to provide irrigation to new COM landscaping in the median from Germann to Willis/
Please do not request inspections under this permit until 2 business days after permit issuance.1 New 20 Amps 3phase
Please do not request inspections under this permit until 2 business days after permit issuance.13 outlets, 3 switches, 1 undercabinet lights, 3 dedicated line, 1 garbage disposal replacement, 1 dishwasher replacement
Please do not request inspections under this permit until 2 business days after permit issuance.EV Charger Install
Please do not request inspections under this permit until 2 business days after permit issuance.installing on deck: 2-ceiling fans 1-switch
Please do not request inspections under this permit until 2 business days after permit issuance.Low voltage for fire alarm associated with 1172387
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical for Kitchen remodel and New master bath.
Please do not request inspections under this permit until 2 business days after permit issuance.UL# E212409 Making final connection for permit#'s: 1174292, 1174293, 1174295, 1174297
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace 200A electrical panel.
Please do not request inspections under this permit until 2 business days after permit issuance.PRIMARY WIRING OF NEW DWELLING
Please do not request inspections under this permit until 2 business days after permit issuance.Install 200-amps heavy- up, install 100-amps subpanel, Run 2 circuits for EV charger
Please do not request inspections under this permit until 2 business days after permit issuance.Bonding and wiring of an inground swimming pool under building permit 1167587
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of solar panels on existing residential roof. 4.79 kW. Addition of 1 0-60A circuits. 11 panels.
install
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a new 200 amp service for an existing residential accessory structure
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (50) ROOF MOUNTED SOLAR PANELS, (50) MICRO INVERTERS, ONE 100A LINE SIDE TAP, 21.500 KW
Please do not request inspections under this permit until 2 business days after permit issuance.400 amp service. New disconnects, SEC, surge protection, panels, breakers and updated grounding
Please do not request inspections under this permit until 2 business days after permit issuance.New entry stairway with new lighting overhead and side of the walk-way.
Please do not request inspections under this permit until 2 business days after permit issuance.Low voltage installation of Nurse Call devices.