Please do not request inspections under this permit until 2 business days after permit issuance.Replacement of an existing fire pump controller. Assoc with FIRE 1166337
Please do not request inspections under this permit until 2 business days after permit issuance.Install 50A circuit to power range
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective inverter. No other changes or upgrades to occur from original installation. Different model SE inverter to be allocated
Please do not request inspections under this permit until 2 business days after permit issuance.Install disconnects for a replaced heat pump and air handler with heater package. Second floor closet Install disconnects for replaced Gas furnace and A/C unit. Basement
Please do not request inspections under this permit until 2 business days after permit issuance.To Install 15.75 KW DC (35 Module) On The Roof Of The Building
Please do not request inspections under this permit until 2 business days after permit issuance.Outdoor Unit Circuit Install and Water Heater Circuit Install
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (20) ROOF MOUNTED SOLAR PANELS, (20) MICRO INVERTERS, ONE 35A FUSED LINE SIDE TAP, 8.600 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (35) ROOF MOUNTED SOLAR PANELS, (35) MICRO INVERTERS, ONE 70A LINE SIDE TAP, 15.400 KW
Please do not request inspections under this permit until 2 business days after permit issuance.CUSTOMER WANTS TO USE EPLANS INSTALL ROOF MOUNTED SOLAR PANELS ENERGY STORAGE SYSTEM
Please do not request inspections under this permit until 2 business days after permit issuance.inverter swap different model
Replace existing electrical panel with new 200 amp bus panel and 150 amp main breaker at the same location. Existing underground electrical service to remain. No special inspections. Minimum required building inspections: Electric rough in and electric final.
The contractor is planning to install temporary portable generators on-site. The master plan has already been approved, under PMT24-15709 and the temporary generators will be in place for a duration of 3 to 4 months until permanent power is available. The temporary portable generators will be utilized for commissioning activities to facilitate an early start-up of all mechanical and electrical systems.
Donor antenna is installed on the roof and takes signal to the BDA (Bio-Directional Amplifier) from riser. BDA then Amplifies the signal and sends it to the DAS (Distributed Antenna System). All coax cable will be installed in conduit per fire code. System will be monitored with 7 Supervisory signals sent to the Fire Alarm Control Panel from BBU (Battery Back Up) Annunciator Panel.
Construction of 337 sq ft livable accessory structure, 74 sq ft deck under new awning and 167 sq ft covered parking area. Electric and plumbing for bathroom, washer/dryer on raised deck. Type V-B construction. No upgrade to utilities. No deferred items. No special inspections. Engineering provided by John C. Schneider, No. 27350, expires 9-30-26. All construction extending outside premanufactured structures are governed by the City of Mesa. Minimum of one 9-ft x 18-ft unobstructed paved parking
Existing building. Install iron site fencing, (2) manual roller vehicle gates, and (2) manual man gates. Associated with PMT26-11732, same scope of work for adjacent property. Approved as noted. Results in CofC.
Tenant improvement for coffee shop with indoor and outdoor seating area. DEFERRED FIRE SPRINKLERS. Related to PMT23-16949.
±3,400 SQ. FT. Interior Remodel within an existing warehouse in the FujiFILM Facility. Deferred fire sprinklers and fire alarm.
Minor TI in an existing 187,045 SF one-story, construction type III-B, B and S-1 occupancy warehouse building and shell suite. Scope includes construction of one new unisex restroom at the south end of the building. Work includes architectural and MEP's. High-pile storage and hazardous material storage are not included in this permit. Reviewed as noted. Results in CoO.
CONSTRUCT A 656 SF SWIMMING POOL & 50 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 65-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER, 87-FT OF 1-IN PE GAS LINE TO 75K BTU FIREPIT, AND 145-FT OF 1-IN PE GAS LINE TO 65K BTU BBQ. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS. COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSO
New 75 SF bathroom and extend 71 SF existing kitchen. Ref: PMT23-16169. Minimum required building inspections: Footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear and final. If needed, underground electrical and plumbing.
Remodel of SFR guest room into guest suite, relocation of hvac and 1 shear wall. No added square footage, no new plumbing or electrical. Minimum required inspections: strap/shear, frame, insulation, Mechanical Final, drywall shear, and final.
Tenant improvement in existing 5,092 SF suite type VB construction, B and S1 occupancy. Modifications include Occupancy group request to be B and F1 occupancy and install of bridge crane, fabrication equip: plasma welder, bandsaw, air compressor, office cubicles and forklift charger. Modifications include structural footings for premanufactured bridge crane, compress air piping, elect outlets and disconnects switches for equips from existing power. Special inspection req. steel, concrete, soils,
New 12 inch looped fire line extension to provide service connections to Building 570 and a potential expansion.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
Install 65 semi-cantilevered box beam covered parking spaces.
New 1,075 SF canopy for a generator at an existing building. Special inspections required: cast-in-place deep foundations and steel construction. Approved as noted. Results in CofC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESUL
1 Wall cabinet 1 blade sign 1 face replacement of monument sign 1 canopy mounted trimless face-lit channel letters
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Install three 50 sq. ft. each LED illuminated pan channel letter sets on backer panel on north, east and west elevations of suite FIVE GUYS and install tenant panel in existing monument sign. Signs shall be installed per NEC 2023 with UL listed components.