Search Permits
246,803 results
CONSTRUCT A 445-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY NO.30895, EXPIRES 12-31-26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMEN
PLUMBING PERMIT CONVERTING TUB TO SHOWER. REPLACING PAN, DRAIN, AND VALVES.USING TEMPERED SHOWER DOOR. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC
Installation of a 60A dedicated circuit breaker for a wall connector EV charger label II located in the garage. Existing 125A sub-panel. Electrical shall be installed per manufacturer's specifications and comply with 2024 IRC, 2023 NEC and SRP standards. Minimum required building inspections: Electric rough in and electric final.
COD26-04348 - Enclose the existing one-car carport on the south side of the existing ranch-style residence and construct a small rear addition extending from the carport to align with the existing sloped-roof addition on the east side of the home. The enclosed and added space will be converted into an Accessory Dwelling Unit (ADU) consisting of living space, one bathroom, and a small kitchen. Work will include required framing, roofing, insulation, drywall, electrical, plumbing, HVAC, doors, win
Converting existing 722 SF garage to livable and 48 SF of livable addition and a new 620 SF detached garage. Minimum required building inspections for the alteration: Footing, stem, frame, mechanical rough in, electric rough in, plumbing rough in, insulation and final. Minimum required building inspections for the detached garage: Footing, stem, strap and shear, framing and final. If needed, underground electrical and plumbing.
Roofing / concrete / Framing. Replacing a post that was damaged. OTC per Rich Lemcke.
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 16-FT X 62-FT 2027 CHAMPION GROUND SET MH SERIAL NO.157-00P-H-A007060A. WITH COM GAS. ONE 18-FT X 42-FT ATTACHED AWNING ICCESR 4436. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE WITH MINIMUM OF ONE COVERED. 62-FT X 78-FT INTERIOR LOT. MINIMUM SETBACKS ARE 5-FT FRONT MEASURED FROM EDGE OF ASPHALT, 5-FT REAR FOR A TOT
tenant improvement- expansion of office portion of suite (+/-3609 sf), additional HVAC, modifications to electrical. REF: PMT25-20005 Suite Separation 114 & 119 REF: PMT20-14393 Suite 111-119 REF: PMT18-07171 Bldg Shell. Deferred fire sprinklers and fire alarm.
Helical Pier Installation. Special inspection required for: Helical Pier Installation.
Tenant improvement of approximately 12,381 SF within an existing Group B construction type II-B, office space. Scope includes construction of new office and support spaces with new interior partitions, millwork, finishes, ceilings, lighting, and associated mechanical and electrical modifications, including related rooftop HVAC work. Deferred fire sprinklers and fire alarm. Access control under separate submittal. Special inspection for welding and steel. Results in CoO. Occupancy B, Building ty
Install (2) exterior wall mounted illuminated signs with pan channel lettering: South elevation 21 sq.ft. BUENA PAPA FRY BAR. North elevation 51 sq.ft BUENA PAPA FRY BAR.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF TWO TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
The purpose of these drawings is to support the permit application for a new outdoor dining area located beneath a portion of the existing covered patio. Project considerations include: A new fenced outdoor seating area is proposed, containing three dining tables. The total occupant load for the proposed restaurant, including the outdoor seating area, is lower than that of the previous establishment. Based on historical photographs and archived plans of the former restaurant, the previous occupa
Work to include the expansion of existing office space. Tenant improvement to include the demolition of interior partitions and the construction of new interior partitions. New multi-user and single-user ADA restrooms, ceiling, lighting, finishes and millwork throughout. M/P/E to suit new layout. Exterior doors to remain and be reused, patch/repair to like-new condition. New 1-hour rated demising wall to separate office use from warehouse area. Ref: PMT26-17259, 12002, 12243. Deferred fire spri
Existing gas station convenience store. Relocate and replace existing equipment inside store. Replace restroom plumbing fixtures like for like. New electrical. Approved as noted. Results in CofC.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Existing daycare suite. Demo existing partition wall. New partition walls, interior door frame, and interior door. New wall bracing at walls previously added during unpermitted construction. Existing CofO under permit #19450 11/18/1987. Deferred fire sprinklers and fire alarm. Approved as noted. Results in CofC.
Installation of one set of reverse lit pan channel letters. 21 sq ft - DIOR NAIL BAR.
Plumbing permit to replace existing wet space with new shower including new valve and prefabricated acrylic walls in the upstairs guest bathroom. No structural changes. New installations will tie into existing piping. No change to overall square footage. No other work under this permit. All work to comply with 2024 IRC and 2023 NEC.
COB26-00246 new construction where fire destroyed original residence
Add 2 pull stations to the Lobby and ED entrances for the continued protection of the BDMC building.
Detached guest house
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
CONSTRUCT A 660 SF SWIMMING POOL & 70 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 30-FT OF 1-IN PE GAS LINE BURIED 18-IN DEEP WITH 14 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & S GAS REQUIREMENTS. SW GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26
Installation of a 60A dedicated circuit breaker for a wall connector hardwired tesla vehicle charger in the garage. Also, a 30A dedicated circuit breaker for a Mini-Split in the garage. Minimum required building inspections: Electric rough in and electric final.
Installation of one 91 sq. ft. LED Halo Lit Illuminated Reverse Pan Channel Lettersets on North Elevation of Building AMPHENOL INDUSTRIAL. Signs shall be installed per NEC 2023 with UL listed components.
approximately 860 SF of renovated area in an existing commercial/light industrial facility owned and operated by FujiFilm as the sole tenant and LL. Renovations are targeted to a very small area in the building and involve only minor structural upgrades plus renovations to the existing architectural, mechanical, electrical, and life safety systems. There are no hazardous materials to be considered in this scope of work.
Install one double faced internally LED illuminated detached sign 10' x 7'4". Sign area 32 sq.ft. Power supplied from new building electrical panel REF: PMT24-19661. Results in CofC.
This is in city of Mesa Right of Way need Green Tag PMT. Have received UTL permit from engineering . UTL26-00442. Verizon Small Wireless Facility.