Search Permits
246,803 results
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (22) ROOF MOUNTED SOLAR PANELS, (22) MICRO INVERTERS, ONE 45A LINE SIDE TAP, 9.680 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Wire to and connect perpendicular blade sign.
Please do not request inspections under this permit until 2 business days after permit issuance.400 AMP service new construction residence including all rough-in and final electrical installations
Please do not request inspections under this permit until 2 business days after permit issuance. Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance.Renovation of Hallway Bathroom, Master Bathroom, New washer circuit 120 amps, New dryer circuit 240 amps
Please do not request inspections under this permit until 2 business days after permit issuance.3 LIGHTS, 1 OUTLET, 1 SWITCH
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a temporary electrical service for construction.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a temporary Electrical service for construction.
Please do not request inspections under this permit until 2 business days after permit issuance.New Construcci�n/New Service Equipment Heavy Up 400 amps/We will need Cut-In Power Pepco
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective Powerwall and Inverter.
Please do not request inspections under this permit until 2 business days after permit issuance.adding a 15 amp and 20 amp circuits for sand mound sewage disposal
Please do not request inspections under this permit until 2 business days after permit issuance.Install EV charger
Please do not request inspections under this permit until 2 business days after permit issuance.Install 38 rooftop solar panels 17.1kW.
Please do not request inspections under this permit until 2 business days after permit issuance.Final connection to existing electrical for one (1) set of address numbers.
Please do not request inspections under this permit until 2 business days after permit issuance.TO WIRE NEW HOME.
Please do not request inspections under this permit until 2 business days after permit issuance.TO WIRE NEW HOME.
Please do not request inspections under this permit until 2 business days after permit issuance.RENOVATION OF MASTER BATHROOM. ELECTRICAL WORK. INSTALLATION OF: (10) RECESSED LIGHTS, #(3) GFCI OUTLETS, #(1) TOWEL WARMER, #(2) EXHAUST FAN, #(1) SCONCE, #(2) CIRCUITS AND #(3) SWITCHES
Please do not request inspections under this permit until 2 business days after permit issuance.install 22 kw with 1 200 amp service rated transfer switch
Please do not request inspections under this permit until 2 business days after permit issuance.TO WIRE NEW HOME.
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy Up 200 Amps/Panel replacement
Please do not request inspections under this permit until 2 business days after permit issuance.Wiring renewal for a finish basement with rec area, gym, bedroom, bathroom, laundry and mechanical closet.
Please do not request inspections under this permit until 2 business days after permit issuance.Wiring renewal for a finish basement with gym, storage, laundry, half bathroom, and unfinished mechanical room.
Please do not request inspections under this permit until 2 business days after permit issuance.Install 4 recessed lights , 4 receptacles , 1 ceiling fan , 1 spot light , for new screen proch.
Please do not request inspections under this permit until 2 business days after permit issuance.30 amp circuit to new heat pump water heater and heavy up 100-200 amp
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary removal and reinstallation of 28 existing roof-mounted solar panels.
Please do not request inspections under this permit until 2 business days after permit issuance.renovation proj; 25- recep, 20- light, 4- appliance.
Install canopy (427 SF) over existing electrical switchgear at Boeing substation. Special inspections required: steel construction, concrete construction, soils, high strength bolting, and post-installed anchors. Results in CofC.
Tenant improvement of approximately 3,945 SF within an existing Group B construction type II-B, office space. Scope includes new interior partitions, restrooms, millwork, finishes, ceilings, lighting, and associated mechanical, plumbing, and electrical modifications to support the new office layout. Deferred fire sprinklers and fire alarm. Access control under separate submittal. Special inspection for welding and steel. Results in CoO.
Install one illuminated pan channel lettersets and logo on raceway SELF STORAGE 30 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.